49 C.F.R. § 1152.32
This section defines: Which cost elements are eligible for inclusion in the calculation of avoidable costs; the conditions under which certain cost elements become eligible for inclusion; and the basis of apportioning those cost elements which are not assigned to the branch on an actual expense basis. The avoidable costs of providing freight service on a branch shall be the total of the costs assigned to the branch in accordance with this section. The avoidable costs of providing freight service on a branch shall be just and reasonable, and shall not exceed those necessary for an honest and efficient operation. Those expenses apportioned under this section shall be derived from the latest Form R-1 Annual Report for Class I railroads filed with the Board prior to the conclusion of the subsidy year, and company records for all non-Class I railroads, and assigned to the branch according to the procedures set forth in § 1152.33 of these regulations. When the term “Actual” is specified as the basis for assigning an expense, it shall mean that the only costs which can be assigned to the account are those costs which are incurred solely as a result of the continuation of rail freight service on the branch. The accounts in the following charts, which list only the “freight-only” account numbers, shall include the portion of common expenses that have been apportioned to freight service.
| Operating expense group and accounts | Account No. | Basis of assignment to on-branch costs |
|---|---|---|
| (a) Maintenance of way and structures: | ||
| (1) Administration: Track: | ||
| Salaries and wages | 11-13-02 | Actual. |
| Materials | 21-13-02 | Do. |
| Purchased services | 41-13-02 | Do. |
| Other expenses | 61-13-02 | Do. |
| Bridges and buildings | ||
| Salaries and wages | 11-13-03 | Do. |
| Materials | 21-13-03 | Do. |
| Purchased services | 41-13-03 | Do. |
| Other expenses | 61-13-03 | Do. |
| Signals | ||
| Salaries and wages | 11-13-04 | Do. |
| Materials | 21-13-04 | Do. |
| Purchased services | 41-13-04 | Do. |
| Other expenses | 61-13-04 | Do. |
| Communications | ||
| Salaries and wages | 11-13-05 | Do. |
| Materials | 21-13-05 | Do. |
| Purchased services | 41-13-05 | Do. |
| Other expenses | 61-13-05 | Do. |
| Other | ||
| Salaries and wages | 11-13-06 | Do. |
| Materials | 21-13-06 | Do. |
| Purchased services | 41-13-06 | Do. |
| Other expenses | 61-13-06 | Do. |
| (2) Repair maintenance and other roadway—running: | ||
| Salaries and wages | 11-11-10 | Do. |
| Materials | 21-11-10 | Do. |
| Repairs by others—DR | 39-11-10 | Do. |
| Repairs for others—CR | 40-11-10 | Do. |
| Purchased services | 41-11-10 | Do. |
| Other expenses | 61-11-10 | Do. |
| Roadway—switching | ||
| Salaries and wages | 11-12-10 | Do. |
| Materials | 21-12-10 | Do. |
| Repairs by others—DR | 39-12-10 | Do. |
| Repairs for others—CR | 40-12-10 | Do. |
| Purchased services | 41-12-10 | Do. |
| Other expenses | 61-12-10 | Do. |
| Tunnels and subways—running | ||
| Salaries and wages | 11-11-11 | Do. |
| Materials | 21-11-11 | Do. |
| Repairs by others—DR | 39-11-11 | Do. |
| Repairs for others—CR | 40-11-11 | Do. |
| Purchased services | 41-11-11 | Do. |
| Other expenses | 61-11-11 | Do. |
| Tunnels and subways—switching | ||
| Salaries and wages | 11-12-11 | Do. |
| Materials | 21-12-11 | Do. |
| Repairs by others—DR | 39-12-11 | Do. |
| Repairs for others—CR | 40-12-11 | Do. |
| Purchased services | 41-12-11 | Do. |
| Other expenses | 61-12-11 | Do. |
| Bridges and culverts—running | ||
| Salaries and wages | 11-11-12 | Do. |
| Materials | 21-11-12 | Do. |
| Repairs by others—DR | 39-11-12 | Do. |
| Repairs for others—CR | 40-11-12 | Do. |
| Purchased services | 41-11-12 | Do. |
| Other expenses | 61-11-12 | Do. |
| Bridges and culverts—switching | ||
| Salaries and wages | 11-12-12 | Do. |
| Materials | 21-12-12 | Do. |
| Repairs by others—DR | 39-12-12 | Do. |
| Repairs for others—CR | 40-12-12 | Do. |
| Purchased services | 41-12-12 | Do. |
| Other expenses | 61-12-12 | Do. |
| Ties—running—material | 21-11-13 | Do. |
| Ties—switching—material | 21-12-13 | Do. |
| Rails—running—material | 21-11-14 | Do. |
| Rails—switching—material | 21-12-14 | Do. |
| Other track material—running—material | 21-11-15 | Do. |
| Other track material—switching—material | 21-12-15 | Do. |
| Ballast—running—material | 21-11-16 | Do. |
| Ballast—switching—material | 21-12-16 | Do. |
| Track laying and surfacing—running | ||
| Salaries and wages | 11-11-17 | Do. |
| Materials | 21-11-17 | Do. |
| Repairs by others—DR | 39-11-17 | Do. |
| Repairs for others—CR | 40-11-17 | Do. |
| Purchased services | 41-11-17 | Do. |
| Other expenses | 61-11-17 | Do. |
| Track laying and surfacing—switching | ||
| Salaries and wages | 11-12-17 | Do. |
| Materials | 21-12-17 | Do. |
| Repairs by others—DR | 39-12-17 | Do. |
| Repairs for others—CR | 40-12-17 | Do. |
| Purchased services | 41-12-17 | Do. |
| Other expenses | 61-12-17 | Do. |
| Road property damaged—running | ||
| Salaries and wages | 11-11-48 | Do. |
| Materials | 21-11-48 | Do. |
| Repairs by others—DR | 39-11-48 | Do. |
| Repairs for others—CR | 40-11-48 | Do. |
| Purchased services | 41-11-48 | Do. |
| Other expenses | 61-11-48 | Do. |
| Road property damaged—switching | ||
| Salaries and wages | 11-12-48 | Do. |
| Materials | 21-12-48 | Do. |
| Repairs by others—DR | 39-12-48 | Do. |
| Repairs for others—CR | 40-12-48 | Do. |
| Purchased services | 41-12-48 | Do. |
| Other Expenses | 61-12-48 | Do. |
| Road property damaged—other | ||
| Salaries and wages | 1-13-48 | Do. |
| Materials | 21-13-48 | Do. |
| Repairs by others—DR | 39-13-48 | Do. |
| Repairs for others—CR | 40-13-48 | Do. |
| Purchased services | 41-13-48 | Do. |
| Other expenses | 61-13-48 | Do. |
| Signals and interlockers—running | ||
| Salaries and wages | 11-11-19 | Do. |
| Materials | 21-11-19 | Do. |
| Repairs by others—DR | 39-11-19 | Do. |
| Repairs for others—CR | 40-11-19 | Do. |
| Purchased services | 41-11-19 | Do. |
| Other expenses | 61-11-19 | Do. |
| Signals and interlockers—switching | ||
| Salaries and wages | 11-12-19 | Do. |
| Materials | 21-12-19 | Do. |
| Repairs by others—DR | 39-12-19 | Do. |
| Repairs for others—CR | 40-12-19 | Do. |
| Purchased services | 41-12-19 | Do. |
| Other expenses | 61-12-19 | Do. |
| Communications systems | ||
| Salaries and wages | 11-13-20 | Do. |
| Materials | 21-13-20 | Do. |
| Repairs by others—DR | 39-13-20 | Do. |
| Repairs for others—CR | 40-13-20 | Do. |
| Purchased services | 41-13-20 | Do. |
| Other expenses | 61-13-20 | Do. |
| Electric power systems | ||
| Salaries and wages | 11-13-21 | Do. |
| Materials | 21-13-21 | Do. |
| Repairs by others—DR | 39-13-21 | Do. |
| Repairs for others—CR | 40-13-21 | Do. |
| Purchased services | 41-13-21 | Do. |
| Other expenses | 61-13-21 | Do. |
| Highway grade crossings—running | ||
| Salaries and wages | 11-11-22 | Do. |
| Materials | 21-11-22 | Do. |
| Repairs by others—DR | 39-11-22 | Do. |
| Repairs for others—CR | 40-11-22 | Do. |
| Purchased services | 41-11-22 | Do. |
| Other expenses | 61-11-22 | Do. |
| Highway grade crossings—switching | ||
| Salaries and wages | 11-12-22 | Do. |
| Materials | 21-12-22 | Do. |
| Repairs by others—DR | 39-12-22 | Do. |
| Repairs for others—CR | 40-12-22 | Do. |
| Purchased services | 41-12-22 | Do. |
| Other expenses | 61-12-22 | Do. |
| Station and office buildings | ||
| Salaries and wages | 11-13-23 | Do. |
| Materials | 21-13-23 | Do. |
| Repairs by others—DR | 39-13-23 | Do. |
| Repairs for others—CR | 40-13-23 | Do. |
| Purchased services | 41-13-23 | Do. |
| Other expenses | 61-13-23 | Do. |
| Station buildings—locomotives | ||
| Salaries and wages | 11-13-24 | Do. |
| Materials | 21-13-24 | Do. |
| Repairs by others—DR | 39-13-24 | Do. |
| Repairs for others—CR | 40-13-24 | Do. |
| Purchased services | 41-13-24 | Do. |
| Other expenses | 61-13-24 | Do. |
| Shop buildings—freight cars | ||
| Salaries and wages | 11-13-25 | Do. |
| Materials | 21-13-25 | Do. |
| Repairs by others—DR | 39-13-25 | Do. |
| Repairs for others—CR | 40-13-25 | Do. |
| Purchased services | 41-13-25 | Do. |
| Other expenses | 61-13-25 | Do. |
| Shop buildings—other equipment | ||
| Salaries and wages | 11-13-26 | Do. |
| Materials | 21-13-26 | Do. |
| Repairs by others—DR | 39-13-26 | Do. |
| Repairs for others—CR | 40-13-26 | Do. |
| Purchased services | 41-13-26 | Do. |
| Other expenses | 61-13-26 | Do. |
| Locomotive servicing facilities | ||
| Salaries and wages | 11-13-27 | Do. |
| Materials | 21-13-27 | Do. |
| Repairs by others—DR | 39-13-27 | Do. |
| Repairs for others—CR | 40-13-27 | Do. |
| Purchased services | 41-13-27 | Do. |
| Other expenses | 61-13-27 | Do. |
| Miscellaneous buildings and structures | ||
| Salaries and wages | 11-13-28 | Do. |
| Materials | 21-13-28 | Do. |
| Repairs by others—DR | 39-13-28 | Do. |
| Repairs for others—CR | 40-13-28 | Do. |
| Purchased services | 41-13-28 | Do. |
| Other expenses | 61-13-28 | Do. |
| Coal terminals | ||
| Salaries and wages | 11-13-29 | Do. |
| Materials | 21-13-29 | Do. |
| Repairs by others—DR | 39-13-29 | Do. |
| Repairs for others—CR | 40-13-29 | Do. |
| Purchased services | 41-13-29 | Do. |
| Other expenses | 61-13-29 | Do. |
| Ore terminals | ||
| Salaries and wages | 11-13-30 | Do. |
| Materials | 21-13-30 | Do. |
| Repairs by others—DR | 39-13-30 | Do. |
| Repairs for others—CR | 40-13-30 | Do. |
| Purchased services | 41-13-30 | Do. |
| Other expenses | 61-13-30 | Do. |
| TOFC/COFC terminals | ||
| Salaries and wages | 11-13-31 | Do. |
| Materials | 21-13-31 | Do. |
| Repairs by others—DR | 39-13-31 | Do. |
| Repairs for others—CR | 40-13-31 | Do. |
| Purchased services | 41-13-21 | Do. |
| Other expenses | 61-13-31 | Do. |
| Other marine terminals | ||
| Salaries and wages | 11-13-32 | Do. |
| Materials | 21-13-32 | Do. |
| Repairs by others—DR | 39-13-32 | Do. |
| Repairs for others—CR | 40-13-32 | Do. |
| Purchased services | 41-13-32 | Do. |
| Other expenses | 61-13-32 | Do. |
| Motor vehicle loading and distribution facilities | ||
| Salaries and wages | 11-13-33 | Do. |
| Materials | 21-13-33 | Do. |
| Repairs by others—DR | 39-13-33 | Do. |
| Repairs for others—CR | 40-13-33 | Do. |
| Purchased services | 41-13-33 | Do. |
| Other expenses | 61-13-33 | Do. |
| Facilities for other specialized service operations | ||
| Salaries and wages | 11-13-35 | Do. |
| Materials | 21-13-35 | Do. |
| Repairs by others—DR | 39-13-35 | Do. |
| Repairs for others—CR | 40-13-35 | Do. |
| Purchased services | 41-13-35 | Do. |
| Other expenses | 61-13-35 | Do. |
| Roadway machines | ||
| Salaries and wages | 11-13-36 | Daily repair costs per GMA, for each type of machine used on the branch line sec. 1152.33(a)(1). |
| Materials | 21-13-36 | Do. |
| Repairs by others—DR | 39-13-36 | Do. |
| Repairs for others—CR | 40-13-36 | Do. |
| Purchased services | 41-13-36 | Do. |
| Other expenses | 61-13-36 | Do. |
| Small tools and supplies | ||
| Other expenses | 11-13-37 | Assign supplies on the daily costs per GMA, for each type of machine used on the branch; small tool assign to maintenance of way 11- 11/12-10 through 17, and 48, sec. 1152.33(a)(2). |
| Materials | 21-13-37 | Do. |
| Repairs by others—DR | 39-13-37 | Do. |
| Repairs for others—CR | 40-13-37 | Do. |
| Purchased services | 41-13-37 | Do. |
| Other expenses | 61-13-37 | Do. |
| Snow removal | ||
| Salaries and wages | 11-13-38 | Actual. |
| Materials | 21-13-38 | Do. |
| Repairs by others—DR | 39-13-38 | Do. |
| Repairs for others—CR | 40-13-38 | Do. |
| Purchased Services | 41-13-38 | Do. |
| Other expenses | 61-13-38 | Do. |
| Fringe benefits—running | 12-11-00 | 11-11-XX, sec. 1152.33(a)(3)(i). |
| Fringe benefits—switching | 12-12-00 | 11-12-XX, sec. 1152.33(a)(3)(ii). |
| Fringe benefits—other | 12-13-00 | 11-13-XX, sec. 1152.33(a)(3)(iii). |
| Casualties and insurance—running | ||
| Other casualties | 52-11-00 | Actual. |
| Insurance | 53-11-00 | Do. |
| Casualties and insurance—switching | ||
| Other casualties | 52-12-00 | Do. |
| Insurance | 53-12-00 | Do. |
| Lease rentals—debit—running | 31-11-00 | Do. |
| Lease rentals—debit—switching | 31-12-00 | Do. |
| Lease rentals—debit—other | 31-13-00 | Do. |
| Lease rentals—credit—running | 32-11-00 | Do. |
| Lease rentals—credit—switching | 32-12-00 | Do. |
| Lease rentals—credit—other | 32-13-00 | Do. |
| Joint facility rent—debit—running | 33-11-00 | Do. |
| Joint facility rent—debit—switching | 33-12-00 | Do. |
| Casualties and insurance—other | ||
| Other casualties | 52-13-00 | Do. |
| Insurance | 53-13-00 | Do. |
| Joint facility—debit—other | 33-13-00 | Do. |
| Joint facility rent—credit—running | 34-11-00 | Do. |
| Joint facility rent—credit—switching | 34-12-00 | Do. |
| Joint facility rent—credit—other | 34-13-00 | Do. |
| Other rents—debit—running | 35-11-00 | Do. |
| Other rents—debit—switching | 35-12-00 | Do. |
| Other rents—debit—other | 35-13-00 | Do. |
| Other rents—credit—running | 36-11-00 | Do. |
| Other rents—credit—switching | 36-12-00 | Do. |
| Other rents—credit—other | 36-13-00 | Do. |
| Depreciation—running | 62-11-00 | Do. |
| Depreciation—switching | 62-12-00 | Do. |
| Depreciation—other | 62-13-00 | Do. |
| Joint facility—debit—running | 37-11-00 | Do. |
| Joint facility—debit—switching | 37-12-00 | Do. |
| Joint facility—debit—other | 37-13-00 | Do. |
| Joint facility—credit—running | 38-11-00 | Do. |
| Joint facility—credit—switching | 38-12-00 | Do. |
| Joint facility—credit—other | 38-13-00 | Do. |
| Dismantling retired road property—running | ||
| Salaries and wages | 11-11-39 | Do. |
| Materials | 21-11-39 | Do. |
| Purchased services | 41-11-39 | Do. |
| Other expenses | 61-11-39 | Do. |
| Dismantling retired road property—switching | ||
| Salaries and wages | 11-12-39 | Do. |
| Materials | 21-12-39 | Do. |
| Purchased services | 41-12-39 | Do. |
| Other expenses | 61-12-39 | Do. |
| Dismantling retired road property—other | ||
| Salaries and wages | 11-13-39 | Do. |
| Materials | 21-13-39 | Do. |
| Purchased services | 41-13-39 | Do. |
| Other expenses | 61-13-39 | Do. |
| Other—running | ||
| Salaries and wages | 11-11-99 | Do. |
| Materials | 21-11-99 | Do. |
| Purchased services | 41-11-99 | Do. |
| Other expenses | 61-11-99 | Do. |
| Other—switching | ||
| Salaries and wages | 11-12-99 | Do. |
| Materials | 21-12-99 | Do. |
| Purchased Services | 41-12-99 | Do. |
| Other Expenses | 61-12-99 | Do. |
| Other—other | ||
| Salaries and wages | 11-13-99 | Do. |
| Materials | 21-13-99 | Do. |
| Purchased services | 41-13-99 | Do. |
| Other expenses | 61-13-99 | Do. |
| (b) Maintenance of equipment: | ||
| (1) Locomotives: Administration | ||
| Salaries and wages | 11-21-01 | Do. |
| Materials | 21-21-01 | Do. |
| Purchased services | 41-21-01 | Do. |
| Other expenses | 61-21-01 | Do. |
| Repairs and maintenance | ||
| Salaries and wages | 11-21-41 | Road diesel and road electric locomotive gross ton miles. Yard diesel and yard electric locomotive unit hours, § 1152.33(b)(1). |
| Materials | 21-21-41 | Do. |
| Repairs by others—DR | 39-21-41 | Do. |
| Repairs for others—CR | 40-21-41 | Do. |
| Purchased services | 41-21-41 | Do. |
| Other expenses | 61-21-41 | Do. |
| Machinery repair | ||
| Salaries and wages | 11-21-40 | Actual. |
| Materials | 21-21-40 | Do. |
| Repairs by others—DR | 39-21-40 | Do. |
| Repairs for others—CR | 40-21-40 | Do. |
| Purchased services | 41-21-40 | Do. |
| Other expenses | 61-21-40 | Do. |
| Equipment damaged | ||
| Salaries and wages | 11-21-48 | Do. |
| Materials | 21-21-48 | Do. |
| Repairs by others—DR | 39-21-48 | Do. |
| Repairs for others—CR | 40-21-48 | Do. |
| Purchased services | 41-21-48 | Do. |
| Other expenses | 61-21-48 | Do. |
| Equipment damaged | ||
| Fringe benefits | 12-21-00 | 11-21-XX, sec. 1152.33(b)(3)(i). |
| Other casualties and insurance | ||
| Other casualties | 52-21-00 | Actual. |
| Insurance | 53-21-00 | Do. |
| Lease rentals—debit | 31-21-00 | Do. |
| Lease rentals—credit | 32-21-00 | Do. |
| Joint facility rent—debit | 33-21-00 | Do. |
| Joint facility rent—credit | 34-21-00 | Do. |
| Other rents—debit | 35-21-00 | Do. |
| Other rents—credit | 36-21-00 | Do. |
| Joint facility—debit | 37-21-00 | Do. |
| Joint facility—credit | 38-21-00 | Do. |
| Depreciation | 62-21-00 | All locomotives, locomotive unit hours, sec. 1152.33(b)(2). |
| Dismantling retired property | ||
| Salaries and wages | 11-21-39 | Actual. |
| Materials | 21-21-39 | Do. |
| Purchased services | 41-21-39 | Do. |
| Other expenses | 61-21-39 | Do. |
| Other | ||
| Salaries and wages | 11-21-99 | Do. |
| Materials | 21-21-99 | Do. |
| Purchased services | 41-21-99 | Do. |
| Other expenses | 61-21-99 | Do. |
| (2) Freight cars: Administration: | ||
| Salaries and wages | 11-22-01 | Do. |
| Materials | 21-22-01 | Do. |
| Purchased services | 41-22-01 | Do. |
| Other expenses | 61-22-01 | Do. |
| Machinery repair | ||
| Salaries and wages | 11-22-40 | Do. |
| Materials | 21-22-40 | Do. |
| Repairs by others—DR | 39-22-40 | Do. |
| Repairs for others—CR | 40-22-40 | Do. |
| Purchased services | 41-22-40 | Do. |
| Other expenses | 61-22-40 | Do. |
| Equipment damage | ||
| Salaries and wages | 11-22-48 | Do. |
| Materials | 21-22-48 | Do. |
| Repairs by others—DR | 39-22-48 | Do. |
| Repairs for others—CR | 40-22-48 | Do. |
| Purchased services | 41-22-48 | Do. |
| Other expenses | 61-22-48 | Do. |
| Fringe benefits | 12-22-00 | 11-22-XX, sec. 1152.33-(b)(3)(iii). |
| Other casualties and insurance | ||
| Other casualties | 52-22-00 | Actual. |
| Insurance | 53-22-00 | Do. |
| Joint facility rent—DR | 33-22-00 | Do. |
| Joint facility rent—CR | 34-22-00 | Do. |
| Joint facility—DR | 37-22-00 | Do. |
| Joint facility—CR | 38-22-00 | Do. |
| Dismantling retired property | ||
| Salaries and wages | 11-22-39 | Do. |
| Materials | 21-22-39 | Do. |
| Purchased services | 41-22-39 | Do. |
| Other expenses | 61-22-39 | Do. |
| Other | ||
| Salaries and wages | 11-22-99 | Do. |
| Materials | 21-22-99 | Do. |
| Purchased services | 41-22-99 | Do. |
| Other expenses | 61-22-99 | Do. |
| Freight car costs per day and per mile: | ||
| Repair and maintenance | ||
| Salaries and wages | 11-22-42 | These accounts are used to develop the cost per car day and per car mile for each type of car, sec. 1152.32(g). |
| Materials | 21-22-42 | Do. |
| Repairs by others—DR | 39-22-42 | Do. |
| Repairs for others—CR | 40-22-42 | Do. |
| Purchased services | 41-22-42 | Do. |
| Other expenses | 61-22-42 | Do. |
| Lease rentals—DR | 31-22-00 | |
| Lease rentals—CR | 32-22-00 | |
| Depreciation | 62-22-00 | |
| Other rents—DR | 35-22-00 | |
| Other rents—CR | 36-22-00 | |
| (3) Other equipment: Administration | ||
| Salaries and wages | 11-23-01 | Actual. |
| Materials | 21-23-01 | Do. |
| Purchased services | 41-23-01 | Do. |
| Other expenses | 61-23-01 | Do. |
| Repair and maintenance: Trucks, trailers and containers—revenue service | ||
| Salaries and wages | 11-23-43 | Do. |
| Materials | 21-23-43 | Do. |
| Repairs by others—DR | 39-23-43 | Do. |
| Repairs for others—CR | 40-23-43 | Do. |
| Purchased services | 41-23-43 | Do. |
| Other expenses | 61-23-43 | Do. |
| Floating equipment—revenue service | ||
| Salaries and wages | 11-23-44 | Do. |
| Materials | 21-23-44 | Do. |
| Repairs by others—DR | 39-23-44 | Do. |
| Repairs for others—CR | 40-23-44 | Do. |
| Purchased services | 41-23-44 | Do. |
| Other expenses | 61-23-44 | Do. |
| Computer and data processing | ||
| Salaries and wages | 11-23-46 | Do. |
| Materials | 21-23-46 | Do. |
| Repairs by others—DR | 39-23-46 | Do. |
| Repairs for others—CR | 40-23-46 | Do. |
| Purchased services | 41-23-46 | Do. |
| Other expenses | 61-23-46 | Do. |
| Machinery | ||
| Salaries and wages | 11-23-40 | Do. |
| Materials | 21-23-40 | Do. |
| Repairs by others—DR | 39-23-40 | Do. |
| Repairs for others—CR | 40-23-40 | Do. |
| Purchased services | 41-23-40 | Do. |
| Other expenses | 61-23-40 | Do. |
| Work and other non revenue equipment | ||
| Salaries and wages | 11-23-47 | Do. |
| Materials | 21-23-47 | Do. |
| Repairs by others—DR | 39-23-47 | Do. |
| Repairs for others—CR | 40-23-47 | Do. |
| Purchased services | 41-23-47 | Do. |
| Other expenses | 61-23-47 | Do. |
| Equipment damaged | ||
| Salaries and wages | 11-23-48 | Do. |
| Materials | 21-23-48 | Do. |
| Repairs by others—DR | 39-23-48 | Do. |
| Repairs for others—CR | 40-23-38 | Do. |
| Purchased services | 41-23-48 | Do. |
| Other expenses | 61-23-48 | Do. |
| Equipment damaged | ||
| Fringe benefits | 12-23-00 | 11-23-XX, sec. 1152.33(b)(3)(ii). |
| Other casualties and insurance | ||
| Other casualties | 52-23-00 | Actual. |
| Insurance | 53-23-00 | Do. |
| Lease rentals—DR | 31-23-00 | Do. |
| Lease rentals—CR | 32-23-00 | Do. |
| Joint facility rent—DR | 33-23-00 | Do. |
| Joint facility rent—CR | 34-23-00 | Do. |
| Other rents—DR | 35-23-00 | Do. |
| Other rents—CR | 36-23-00 | Do. |
| Depreciation | 62-23-00 | Do. |
| Joint facility—DR | 37-23-00 | Do. |
| Joint facility—CR | 38-23-00 | Do. |
| Dismantling retired property | ||
| Salaries and wages | 11-23-39 | Do. |
| Materials | 21-23-39 | Do. |
| Purchased services | 41-23-39 | Do. |
| Other expenses | 61-23-39 | Do. |
| Other | ||
| Salaries and wages | 11-23-99 | Do. |
| Materials | 21-23-99 | Do. |
| Purchased services | 41-23-99 | Do. |
| Other expenses | 61-23-99 | Do. |
| (c) Transportation: | ||
| (1) Train operations: Administration: | ||
| Salaries and wages | 11-31-01 | Do. |
| Materials | 21-31-01 | Do. |
| Purchased services | 41-31-01 | Do. |
| Other expenses | 61-31-01 | Do. |
| Engine crews | ||
| Salaries and wages | 11-31-56 | Do. |
| Materials | 21-31-56 | Train hours, sec. 1152.33(c)(1)(i). |
| Purchased services | 41-31-56 | Actual. |
| Other expenses | 61-31-56 | Do. |
| Train crews | ||
| Salaries and wages | 11-31-57 | Do. |
| Materials | 21-31-57 | Train hours, sec. 1152.33(c)(1)(i). |
| Purchased services | 41-31-57 | Actual. |
| Other expenses | 61-31-57 | Do. |
| Dispatching trains | ||
| Salaries and wages | 11-31-58 | Do. |
| Materials | 21-31-58 | Do. |
| Purchased services | 41-31-58 | Do. |
| Other expenses | 61-31-58 | Do. |
| Operating signals and interlockers | ||
| Salaries and wages | 11-31-59 | Do. |
| Materials | 21-31-59 | Do. |
| Purchased services | 41-31-59 | Do. |
| Other expenses | 61-31-59 | Do. |
| Operating drawbridges | ||
| Salaries and wages | 11-31-60 | Do. |
| Materials | 21-31-60 | Do. |
| Purchased services | 41-31-60 | Do. |
| Other expenses | 61-31-60 | Do. |
| Highway crossing protection | ||
| Salaries and wages | 11-31-61 | Do. |
| Materials | 21-31-61 | Do. |
| Purchased services | 41-31-61 | Do. |
| Other expenses | 61-31-61 | Do. |
| Train and inspection and lubrication | ||
| Salaries and wages | 11-31-62 | Train hours, Sec. 1152.33(c)(1)(i). |
| Materials | 21-31-62 | Do. |
| Purchased services | 41-31-62 | Actual. |
| Other expenses | 61-31-62 | Do. |
| Locomotive fuel | ||
| Salaries and wages | 11-31-67 | Diesel locomotive unit hours, Sec. 1152.33(c)(1)(ii). |
| Materials | 21-31-67 | Do. |
| Purchased services | 41-31-67 | Do. |
| Other expenses | 61-31-67 | Do. |
| Electric power purchased or produced for motive power | ||
| Salaries and wages | 11-31-68 | Electric locomotive unit hours, sec. 1152.33(c)(1)(iii). |
| Materials | 21-31-68 | Do. |
| Purchased services | 41-31-68 | Do. |
| Other expenses | 61-31-68 | Do. |
| Servicing locomotives | ||
| Salaries and wages | 11-31-69 | Locomotive unit miles, sec. 1152.33(c)(1)(iv). |
| Materials | 21-31-69 | Do. |
| Purchased services | 41-31-69 | Do. |
| Other expenses | 61-31-69 | Do. |
| Freight lost or damaged—solely related | 51-31-00 | Actual. |
| Clearing wrecks | ||
| Salaries and wages | 11-31-63 | Do. |
| Materials | 21-31-63 | Do. |
| Purchased services | 41-31-63 | Do. |
| Other expenses | 61-31-63 | Do. |
| Fringe benefits | 12-31-00 | 11-31-XX, sec. 1152.33 (c)(4)(i). |
| Other casualties and insurance | ||
| Other casualties | 52-31-00 | Actual. |
| Insurance | 53-31-00 | Do. |
| Joint facility—DR | 37-31-00 | Do. |
| Joint facility—CR | 38-31-00 | Do. |
| Other | ||
| Salaries and wages | 11-31-99 | Do. |
| Materials | 21-31-99 | Do. |
| Purchased services | 41-31-99 | Do. |
| Other expenses | 61-31-99 | Do. |
| (2) Yard operations: Administration: | ||
| Salaries and wages | 11-32-01 | Do. |
| Materials | 21-32-01 | Do. |
| Purchased services | 41-32-01 | Do. |
| Other expenses | 61-32-01 | Do. |
| Switch crews | ||
| Salaries and wages | 11-32-64 | Do. |
| Materials | 21-32-64 | Locomotive unit hours, sec. 1152.33(c)(2)(i) |
| Purchased services | 41-32-64 | Actual. |
| Other expenses | 61-32-64 | Do. |
| Controlling operations | ||
| Salaries and wages | 11-32-65 | Do. |
| Materials | 21-32-65 | Do. |
| Purchased services | 41-32-65 | Do. |
| Other expenses | 61-32-65 | Do. |
| Yard and terminal clerical | ||
| Salaries and wages | 11-32-66 | Do. |
| Materials | 21-32-66 | Do. |
| Purchased services | 41-32-66 | Do. |
| Other expenses | 61-32-66 | Do. |
| Operating switches, signals, retarders and humps | ||
| Salaries and wages | 11-32-59 | Do. |
| Materials | 21-32-59 | Do. |
| Purchased services | 41-32-59 | Do. |
| Other expenses | 61-32-59 | Do. |
| Locomotive fuel | ||
| Salaries and wages | 11-32-67 | Dieselloco motive unit hours, sec. 1152.33(c)(2)(ii) |
| Materials | 21-32-67 | Do. |
| Purchased services | 41-32-67 | Do. |
| Other expenses | 61-32-67 | Do. |
| Electric power purchased or produced for motive power | ||
| Salaries and wages | 11-32-68 | Electric locomotive unit hours, sec. 1152.33(c)(2)(iii). |
| Materials | 21-32-68 | Do. |
| Purchased services | 41-32-68 | Do. |
| Other expenses | 61-32-68 | Do. |
| Servicing locomotives | ||
| Salaries and wages | 11-32-69 | Locomotive unit hours, sec. 1152.33(c)(2)(i). |
| Materials | 21-32-69 | Do. |
| Purchased services | 41-32-69 | Do. |
| Other expenses | 61-32-69 | Do. |
| Freight lost or damaged—solely related | 51-32-00 | Actual. |
| Clearing wrecks | ||
| Salaries and wages | 11-32-63 | Do. |
| Materials | 21-32-63 | Do. |
| Purchased services | 41-32-63 | Do. |
| Other expenses | 61-32-63 | Do. |
| Fringe benefits | 12-32-00 | 11-32-XX, sec. 1152.33(c)(4)(ii). |
| Other casualties and insurance | ||
| Other casualties | 52-32-00 | Actual. |
| Insurance | 53-32-00 | Do. |
| Joint facility—DR | 37-32-00 | Do. |
| Joint facility—CR | 38-32-00 | Do. |
| Other | ||
| Salaries and wages | 11-32-99 | Do. |
| Materials | 21-32-99 | Do. |
| Purchased services | 41-32-99 | Do. |
| Other expenses | 61-32-99 | Do. |
| (3) Train and yard operations common: | ||
| Cleaning car interiors | ||
| Salaries and wages | 11-33-70 | Do. |
| Materials | 21-33-70 | Do. |
| Purchased services | 41-33-70 | Do. |
| Adjusting and transferring loads | ||
| Salaries and wages | 11-33-71 | Do. |
| Materials | 21-33-71 | Do. |
| Purchased services | 41-33-71 | Do. |
| Carloading devices and grain doors | ||
| Salaries and wages | 11-33-72 | Do. |
| Materials | 21-33-72 | Do. |
| Purchased services | 41-33-72 | Do. |
| Freight lost or damaged—all other | 51-33-00 | Do. |
| Fringe benefits | 12-33-00 | 11-33-XX, sec. 1152.33(c)(4)(iii). |
| (4) Specialized service operations: Administration: | ||
| Salaries and wages | 11-34-01 | Actual. |
| Materials | 21-34-01 | Do. |
| Purchased services | 41-34-01 | Do. |
| Other expenses | 61-34-01 | Do. |
| Pick-up and delivery, marine line haul, and rail substitute service | ||
| Salaries and wages | 11-34-73 | Do. |
| Materials | 21-34-73 | Do. |
| Purchased services | 41-34-73 | Do. |
| Other expenses | 61-34-73 | Do. |
| Loading and unloading and local marine | ||
| Salaries and wages | 11-34-74 | Do. |
| Materials | 21-34-74 | Do. |
| Purchased services | 41-34-74 | Do. |
| Other expenses | 61-34-74 | Do. |
| Protective services | ||
| Salaries and wages | 11-34-75 | Do. |
| Materials | 21-34-75 | Do. |
| Purchased services | 41-34-75 | Do. |
| Other expenses | 61-34-75 | Do. |
| Freight lost or damaged—Solely related | 51-34-00 | Do. |
| Fringe benefits | 12-34-00 | 11-34-XX, sec. 1152.33(c)(4)(iv). |
| Casualties and insurance | ||
| Other casualties | 52-34-00 | Actual. |
| Insurance | 53-34-00 | Do. |
| Joint facility—DR | 37-34-00 | Do. |
| Joint facility—CR | 38-34-00 | Do. |
| Other | ||
| Salaries and wages | 11-34-99 | Do. |
| Materials | 21-34-99 | Do. |
| Purchased services | 41-34-99 | Do. |
| Other expenses | 61-34-99 | Do. |
| (5) Administrative support operations: Administration : | ||
| Salaries and wages | 11-35-01 | Do. |
| Materials | 21-35-01 | Do. |
| Purchased services | 41-35-01 | Do. |
| Other expenses | 61-35-01 | Do. |
| Employees performing clerical and accounting functions | ||
| Salaries and wages | 11-35-76 | Do. |
| Materials | 21-35-76 | Do. |
| Purchased services | 41-35-76 | Do. |
| Other expenses | 61-35-76 | Do. |
| Communication systems operation | ||
| Salaries and wages | 11-35-77 | Do. |
| Materials | 21-35-77 | Do. |
| Purchased services | 41-35-77 | Do. |
| Other expenses | 61-35-77 | Do. |
| Loss and damage claims processing | ||
| Salaries and wages | 11-35-78 | Number of claims, sec. 1152.33(c)(3)(i). |
| Materials | 21-35-78 | Do. |
| Purchased services | 41-35-78 | Do. |
| Other expenses | 61-35-78 | Do. |
| Fringe benefits | 12-35-00 | 11-35-XX. sec. 1152.33(c)(4)(v). |
| Joint facility—DR | 37-35-00 | Actual. |
| Joint facility—CR | 38-35-00 | Do. |
| Casualties and insurance | ||
| Other casualties | 52-35-00 | Do. |
| Insurance | 53-35-00 | Do. |
| Other | ||
| Salaries and wages | 11-35-99 | Do. |
| Materials | 21-35-99 | Do. |
| Purchased services | 41-35-99 | Do. |
| Other expenses | 61-35-99 | Do. |
| (d) General Administrative Officers—general administration: | ||
| Salaries and wages | 11-61-01 | Do. |
| Materials | 21-61-01 | Do. |
| Purchased services | 41-61-01 | Do. |
| Other expenses | 61-61-01 | Do. |
| Accounting, auditing and finance | ||
| Salaries and wages | 11-61-86 | Do. |
| Materials | 21-61-86 | Do. |
| Purchased services | 41-61-86 | Do. |
| Other expenses | 61-61-86 | Do. |
| Management services and data processing | ||
| Salaries and wages | 11-61-87 | Do. |
| Materials | 21-61-87 | Do. |
| Purchased services | 41-61-87 | Do. |
| Other expenses | 61-61-87 | Do. |
| Marketing: | ||
| Salaries and wages | 11-61-88 | Do. |
| Materials | 21-61-88 | Do. |
| Purchased services | 41-61-88 | Do. |
| Other expenses | 61-61-88 | Do. |
| Sales | ||
| Salaries and wages | 11-61-89 | Do. |
| Materials | 21-61-89 | Do. |
| Purchased services | 41-61-89 | Do. |
| Other expenses | 61-61-89 | Do. |
| Industrial development | ||
| Salaries and wages | 11-61-90 | Do. |
| Materials | 21-61-90 | Do. |
| Purchased services | 41-61-90 | Do. |
| Other expenses | 61-61-90 | Do. |
| Personnel and labor relations | ||
| Salaries and wages | 11-61-91 | Do. |
| Materials | 21-61-91 | Do. |
| Purchased services | 41-61-91 | Do. |
| Other expenses | 61-61-91 | Do. |
| Legal and secretarial | ||
| Salaries and wages | 11-61-92 | Do. |
| Materials | 21-61-92 | Do. |
| Purchased services | 41-61-92 | Do. |
| Other expenses | 61-61-92 | Do. |
| Public relations and advertising | ||
| Salaries and wages | 11-61-93 | Do. |
| Materials | 21-61-93 | Do. |
| Purchased services | 41-61-93 | Do. |
| Other expenses | 61-61-93 | Do. |
| Research and development | ||
| Salaries and wages | 11-61-94 | Do. |
| Materials | 21-61-94 | Do. |
| Purchased services | 41-61-94 | Do. |
| Other expenses | 61-61-94 | Do. |
| Fringe benefits | 12-61-00 | 11-61-XX, sec. 1152.33(d)(1). |
| Casualties and insurance | ||
| Other casualties | 52-61-00 | Actual |
| Insurance | 53-61-00 | Do. |
| Writedown of uncollectible accounts | 63-61-00 | Do. |
| Other taxes except on corporate income or payroll | 65-61-00 | Do. |
| Joint facility—DR | 37-61-00 | Do. |
| Joint facility—CR | 38-61-00 | Do. |
| Other | ||
| Salaries and wages | 11-61-99 | Do. |
| Materials | 21-61-99 | Do. |
| Purchased services | 41-61-99 | Do. |
| Other expenses | 61-61-99 | Do. |
(g) Freight car costs. For Class I railroads, the on-segment costs for time-mileage freight cars shall be calculated on the basis of the carrier's average cost per day and per mile. Those freight cars that are rented on a straight mileage basis are to be costed on the carrier's average cost per mile for each type of car rented on this basis. No costs are to be included in the calculation for private line (shipper owned) or other cars for which the railroad does not make payments. The cost per day and per mile shall be calculated separately for each type of car specified in Ex Parte No. 334, Car Service Compensation—Basic Per Diem Charges, 362 I.C.C. 884 (1980). The freight car costs shall be separated between “return on value-freight cars” and “freight car costs other than return on freight cars”. The costs assigned to a line under this subsection are to be derived from the accounts listed below.
| Operating expense group—Repair and maintenance | Account No. |
|---|---|
| Salaries and wages | 11-22-42 |
| Materials | 21-22-42 |
| Repairs by others—DR | 39-22-42 |
| Repairs for others—CR | 40-22-42 |
| Purchased services | 41-22-42 |
| Other expenses | 61-22-42 |
| Lease rentals—DR | 31-22-00 |
| Lease rentals—CR | 32-22-00 |
| Depreciation | |
| Other rents—DR | 35-22-00 |
| Other rents—CR | 36-22-00 |
The system total of the repair and maintenance accounts, all accounts designated XX-XX-42, and depreciation shall be divided into time-related costs and mileage-related costs on the basis of 50 percent time and 50 percent mileage for repairs, and 60 percent time and 40 percent mileage for depreciation. Freight car costs shall not include depreciation as determined in Account No. 62-22-00. Freight car depreciation shall be calculated in the manner set forth in paragraph (g)(3)(i) of this section. The system total receipts and payments for the hire of time-mileage cars, and the basic data used in the development of the car-day and car-mile factors, shall be taken from the carrier's latest Form R-1 and company records. The specific steps to complete the calculation are as follows:
(1) The total system car days by car type shall be calculated by:
(3) The cost per car day shall be calculated for each type of time-mileage car by adding 50 percent of total freight car repair costs for each type (Form R-1, schedule 415, column (b)), and 60 percent of the depreciation shall be developed as follows:
(4) The cost per mile shall be calculated for each type of time-mileage car as follows. First, add:
(iii) The mileage portion of the carrier's payments for the hire of time-mileage freight cars (Form R-1, schedule 414, column (f)).
Second, subtract the mileage portion of the carrier's receipts for hire of time-mileage freight cars (Form R-1, schedule 414, column (c)). Finally, divide the result by the total car-miles for each car-type developed in paragraph (g)(2) of this section.
(h) Return on investment—locomotive (line). The return on investment shall be calculated for each type of classification of locomotive that is actually used to provide service to the line segment. The return for the locomotive(s) used shall be calculated in accordance with the following procedure:
(5) The cost assigned to the segment for each type of locomotive shall be calculated by multiplying the annual return on investment developed in paragraph (h)(3) of this section by the ratio(s) developed in paragraph (h)(4) of this section.
(j) Property taxes (Line).
(4) Any property tax properly substantiated under paragraphs (j)(2) or (3) of this section shall be presumed to represent systemwide savings to the carrier. Protestants may rebut this presumption by presenting evidence:
(5) In states where real property taxes are assessed and levied against the owner of the property but the tax on rolling stock is assessed to the railroad operating the service on the basis of a formula of a statewide valuation of property, the tax on rolling stock attributable to each line segment shall be determined as follows:
(m) Rehabilitation.
(1) For abandonment purposes the applicant carrier shall project the amounts necessary to permit efficient operations over the line segment. The carrier shall indicate the level of FRA class safety standard to be attained with the amount of expenditure. See 49 CFR part 213. Applicant, in making its projection of rehabilitation costs, shall give consideration to:
(2) For subsidy purposes rehabilitation costs shall not be included unless:
(n) Off-branch costs. The off-branch costs developed in this section shall be separated between “off-branch costs other than return on freight cars” and “return on value-freight cars”. The off-branch costs shall be developed in the following manner:
(3) The Class I Procedure: A Class I railroad shall calculate its off-branch costs using the Class I procedure as set forth below in this paragraph.
(ii) The modified terminal cost per carload shall be calculated separately for each type of freight car and applied to each car that is attributed to the branch line. The modified terminal cost shall consist of clerical costs, two days of freight car cost, and an inter-intra train switching cost (locomotive engine minute cost only). The clerical cost and inter-intra train switching cost shall be calculated from unit costs developed within the individual URCS application.
(B) The inter-intra train switching cost shall be calculated by multiplying the total switch engine minute cost from URCS Worktable E1, Part 1, line 111, columns 1, 2, and 3 by the total minutes specified in the next sentence. The total minutes specified in this sentence shall equal the sum of:
(1) The minutes per switch event from Worktable E2, Part 1, line 118, column 29; and
(2) The product of the minutes per switch event from Worktable E2, Part 1, line 118, column 29 and the ratio of loaded to total car miles for the particular type of freight car being costed.
(4) A Class II or Class III railroad shall calculate its off-branch costs using any one of three different procedures. The Class I Procedure: A Class II or Class III railroad may calculate its off-branch costs using the Class I procedure set forth in paragraph (n)(3) of this section, if the necessary data are available from the railroad's own records. If the data necessary to complete the Class I procedure set forth in paragraph (n)(3) of this section are not available from the railroad's own records, the Class II or Class III railroad shall calculate its off-branch costs using either one of the following procedures based on the latest regional URCS data and the railroad's own records. The Class II/III Simplified Costing Procedure: A Class II or Class III railroad may calculate its off-branch costs using the Class I procedure set forth in paragraph (n)(3) of this section, with regional URCS data of the Class I railroads used in lieu of individual URCS data of the Class II or Class III railroad. Costs developed through the use of the Class II/III simplified costing procedure shall enjoy a rebuttable presumption of correctness. The Class II/III Standard Costing Procedure: A Class II or Class III railroad may calculate its off-branch costs using the Class II/III standard costing procedure set forth in paragraphs (n)(4)(i) through (n)(4)(xiv) of this section. Costs developed through the use of the Class II/III standard costing procedure shall be given preference over costs developed through the use of the Class II/III simplified costing procedure. The Class II/III standard costing procedure is set forth in paragraphs (n)(4)(i) through (n)(4)(xiv) of this section.
(ii) The total number of revenue carload terminal handlings, as determined from the railroad's records, shall be calculated as the sum of:
(iii) The total number of revenue carload interchange handlings, as determined from the railroad's records, shall be calculated as the sum of:
(iv) The system average shipment weight per car, as determined from the railroad's records, shall be calculated by dividing:
(v) The system average loaded car miles per car, as determined from the railroad's records, shall be calculated by dividing:
(vi) The railroad shall complete a URCS Phase III “Movement Costing Program” based on the application of URCS data for the appropriate region. The following data shall be inputs to the Phase III program application.
(vii) The ratios employed to separate the total estimated system variable expenses, as determined in paragraph (n)(4)(i) of this section, among terminal, interchange, and line-haul operations shall be based on the procedures outlined in this paragraph (n)(4)(vii). This separation shall reflect the variable costs resulting from the application of the URCS Phase III program based on the input factors specified in paragraph (n)(4)(vi) of this section. The ratios shall be calculated in the following manner:
(A) The terminal expenses calculated by the application of the Phase III program shall consist of the following:
(1) “Carload and Clerical Costs” shall be calculated as the sum of lines 256, 258, 260, 262, 264, 266, and 268.
(2) Switching expenses based on “Total SEM-Industry” shall be calculated by multiplying:
(i) The sum of lines 315, 317, and 319, by
(ii) Line 311.
(3) Car mile yard cost “CM(Y)-Industry” shall be calculated by multiplying:
(i) The sum of lines 426, 428, and 430, by
(ii) Line 422.
(4) Car day yard cost “CD(Y)-Industry” and “CD(Y)-L&UL” shall be calculated by multiplying:
(i) The sum of lines 452, 454, and 456, by
(ii) The sum of lines 446 and 450.
(5) The expenses for accessorial services for railroad owned cars shall be calculated as the sum of:
(i) The product of line 422 and the sum of lines 464, 466, and 468; plus
(ii) The product of the sum of lines 446 and 450 and the sum of lines 476, 478, and 480.
(B) The interchange expenses calculated by the application of the Phase III program shall consist of the following:
(1) Switching expenses based on “Total SEM-Interchange” shall be calculated by multiplying
(i) The sum of lines 315, 317, and 319, by
(ii) Line 312.
(2) Car mile cost in interchange “CM(Y)-Interchange” shall be calculated by multiplying:
(i) The sum of lines 426, 428, and 430, by
(ii) Line 423.
(3) Car day cost in interchange “CD(Y)-Interchange (L&E)” shall be calculated by multiplying:
(i) The sum of lines 452, 454, and 456, by
(ii) Line 447.
(4) The expenses for accessorial services for railroad owned cars shall be calculated as the sum of:
(i) The product of line 423 and the sum of lines 464, 466, and 468; plus.
(ii) The product of line 447 and the sum of lines 476, 478, and 480.
(C) The line-haul expenses resulting from the application of the Phase III program shall be calculated by subtracting the sum of:
(1) The terminal expenses as determined in paragraph (n)(4)(vii)(A) of this section, and
(2) The interchange expenses as determined in paragraph (n)(4)(vii)(B) of this section, from
(3) The total variable cost excluding loss and damage as calculated in the Phase III program at line 696.
(viii) The railroad's total estimated system variable expenses shall be separated as follows:
(ix) The railroad's unit costs shall be determined for terminal, interchange, and line-haul operations as follows:
(x) The modified terminal cost per carload is a composite of costs developed in the Phase III program and costs determined in accordance with paragraph (g) of this section and this paragraph. The modified terminal cost per carload shall be calculated for each type of car as follows:
(A) The station clerical cost per carload shall be developed in the following manner:
(1) The station clerical expense ratio shall be calculated by dividing the total clerical cost (the sum of lines 256, 258, 260, 262, 264, 266, and 268) by the terminal expenses as determined in paragraph (n)(4)(vii)(A) of this section.
(2) The station clerical cost per carload shall be calculated by multiplying the terminal cost per carload as determined in paragraph (n)(4)(ix)(A) of this section by the station clerical expense ratio.
(B) The interchange switching cost per carload shall be developed in the following manner:
(1) The total interchange switching expense shall be calculated by multiplying the sum of lines 315, 317, and 319 by line 312.
(2) The interchange switching ratio shall be calculated by dividing the total interchange switching expense by the interchange expenses as determined in paragraph (n)(4)(vii)(B) of this section.
(3) The interchange switching cost per carload shall be calculated by multiplying the interchange cost per carload as determined in paragraph (n)(4)(ix)(B) of this section by the interchange switching ratio.
(xi) The terminal costs shall be calculated by multiplying the terminal cost per carload as determined in paragraph (n)(4)(ix)(A) of this section by the number of carloads that both:
(xii) The interchange costs shall be calculated by multiplying the interchange cost per carload as determined in paragraph (n)(4)(ix)(B) of this section by the number of carloads that both:
(o) Locomotive depreciation. The depreciation expense for locomotives used on the line shall be calculated using the following procedure:
(p) Opportunity costs. Applicant-carrier may, at its discretion, present evidence of its opportunity costs, if the assets engaged in the line proposed to be abandoned could be used more profitably in some other capacity.
Opportunity costs may be calculated in accordance with the methodology established in § 1152.34 of this part, or by using any other reasonable, fully explained method. Opportunity costs are not included as costs on Exhibit 1 described at § 1152.36. These costs should be submitted as a separate exhibit to the application.
(q) Labor costs.
[61 FR 67883, Dec. 24, 1996, as amended at 81 FR 8855, Feb. 23, 2016]