(a) The requirements of this subpart apply to all safety-critical electronic locomotive control systems, subsystems, and components (i.e., “products” as defined in § 229.305), except for the following:
- (1) Products that are fully developed prior to June 8, 2012.
- (2) Products that are under development as of October 9, 2012, and are fully developed prior to October 9, 2017.
- (3) Products that comingle locomotive control systems with safety critical processor based signal and train control systems;
- (4) Products that are used during on-track testing within a test facility; and
(5) Products that are used during on-track testing outside a test facility, if approved by FRA. To obtain FRA approval of on-track testing outside of a test facility, a railroad shall submit a request to FRA that provides:
- (i) Adequate information regarding the function and history of the product that it intends to use;
- (ii) The proposed tests;
- (iii) The date, time and location of the tests; and
- (iv) The potential safety consequences that will result from operating the product for purposes of testing.
- (b) Railroads and vendors shall identify all products identified in paragraph (a)(2) of this section to FRA by February 9, 2013.
- (c) The exceptions provided in paragraph (a) of this section do not apply to products or product changes that result in degradation of safety, or a material increase in safety-critical functionality.
[77 FR 21348, Apr. 9, 2012, as amended at 77 FR 75057, Dec. 19, 2012]