- (a) Because conditions vary at different ports, and sometimes within the same port, it is not practical to develop standard technical provisions covering all phases of stevedoring operations.
- (b) When including rail car, truck, or intermodal equipment loading and unloading, or other dock and terminal work under a stevedoring contract, include these requirements as separate items of work.
[65 FR 50144, Aug. 17, 2000. Redesignated at 75 FR 51417, Aug. 20, 2010]