(1) At least 90 days prior to the planned date of MVDDS commencement of operations, the MVDDS licensee shall provide the following information to the DBS licensee(s):
- (i) Geographic location (including NAD 83 coordinates) of its proposed station location;
- (ii) Maximum EIRP of each transmitting antenna system;
- (iii) Height above ground level for each transmitting antenna;
- (iv) Antenna type along with main beam azimuth and altitude orientation information, and description of the antenna radiation pattern;
- (v) Description of the proposed service area; and
- (vi) Survey results along with a technical description of how it determined compliance with the appropriate EPFD level at all DBS subscriber locations.