The master or person in charge shall ensure that the following are maintained in a crane record book:
(a) Descriptive information which will identify each crane including—
- (1) The API name plate data required by Section 11 of API Spec. 2C, Second Edition, February 1972; and
- (2) The rates load chart for each line reeving and boom length which may be utilized.
- (b) Information required by Section 3 of the American Petroleum Institute Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D, First Edition (October 1972) with supplement 1.
- (c) Dates and results of frequent inspections and tests required in paragraph (b) of this section.
- (d) Dates and results of periodic inspections and tests required in paragraph (b) of this section.
- (e) Date and result of each rated load test.
- (f) Date and description of each replacement or renewal of wire rope, hooks, and other load components.
- (g) Date and description of each failure of the crane, or any component or safety feature.
- (h) Date and description of each repair to the crane structure, boom, or equipment.