(a) A column stabilized unit, or surface type unit when approved by the Commandant, must be specially examined in accordance with a plan—
- (1) Submitted in accordance with paragraph (b) of this section; and
- (2) Accepted by the Commandant (CG-CVC).
(b) To meet the requirements in paragraph (a) of this section, the owner or operator of the unit must submit a plan to the Coast Guard that provides the methods used to determine the condition of the hull and that contains the following information:
- (1) The planned location where the unit is to be examined.
- (2) The draft at which the unit is to be examined.
- (3) The names of the diver or diving company selected for the examination.
- (4) The method of visual presentation for the examination.
- (5) The method used to clean the underwater portion of the hull.
- (6) The method and location of gauging the underwater portion of the hull.
- (7) The number of underwater hull fittings and number of compartments to be opened.
- (8) The underwater high stress areas and the welds in those areas to be examined.
[CGD 73-251, 43 FR 56802, Dec. 4, 1978, as amended by CGD 95-072, 60 FR 50464, Sept. 29, 1995; CGD 96-041, 61 FR 50730, Sept. 27, 1996; USCG-2009-0702, 74 FR 49233, Sept. 25, 2009]