(a) Automatic bilge pumps must—
- (1) Be provided with bilge high level alarms that annunciate in the machinery spaces and at a manned control location and are independent of the pump controls;
- (2) Be monitored to detect excessive operation in a specified time period; and
- (3) Meet all applicable pollution control requirements.