An unedited integration statement must be retained and made available to the BLM upon request. The integration statement must contain the following information:
- (a) The information required in § 3170.7(g) of this part;
- (b) The name of the company performing the integration;
- (c) The month and year for which the integration statement applies;
- (d) Meter-tube inside diameter (inches);
(e) The following primary device information, as applicable:
- (i) Orifice bore diameter (inches); or
- (ii) Beta or area ratio, discharge coefficient, and other information necessary to calculate the flow rate;
- (f) Relative density (specific gravity);
- (g) CO2 content (mole percent);
- (h) N2 content (mole percent);
- (i) Heating value calculated under § 3175.125 (Btu/standard cubic feet);
- (j) Atmospheric pressure or elevation at the FMP;
- (k) Pressure base;
- (l) Temperature base;
- (m) Static-pressure tap location (upstream or downstream);
- (n) Chart rotation (hours or days);
- (o) Differential-pressure bellows range (inches of water);
- (p) Static-pressure element range (psi); and
(q) For each chart or day integrated:
- (i) The time and date on and time and date off;
- (ii) Average differential pressure (inches of water);
- (iii) Average static pressure;
- (iv) Static-pressure units of measure (psia or psig);
- (v) Average temperature ( °F);
- (vi) Integrator counts or extension;
- (vii) Hours of flow; and
- (viii) Volume (Mcf).