43 C.F.R. § 3172.9
(b) Minimum standards for drill stem testing.
(1) A DST that flows to the surface with evidence of hydrocarbons shall be either reversed out of the testing string under controlled surface conditions, or displaced into the formation prior to pulling the test tool. This would involve providing some means for reserve circulation.
| Violation | Corrective action | Normal abatement period |
|---|---|---|
| Major | Contingent on circumstances and as specified by the authorized officer | Prompt correction required. |
(2) Separation equipment required for the anticipated recovery shall be properly installed before a test starts.
| Violation | Corrective action | Normal abatement period |
|---|---|---|
| Major | Install required equipment | Prompt correction required. |
(3) All engines within 100 feet of the wellbore that are required to “run” during the test shall have spark arresters or water-cooled exhausts.
| Violation | Corrective action | Normal abatement period |
|---|---|---|
| Major | Install required equipment | Prompt correction required. |