(b) Project operations will be monitored in part by measuring flows at key locations. Specifically, Project diversions (used in the calculations under § 418.18 below) will be determined by:
(1) Adding flows measured at:
- (i) Truckee Canal near Wadsworth—U.S. Geological Survey (USGS) gauge number 10351300;
- (ii) Carson River below Lahontan Dam—USGS gauge number 10312150;
- (iii) Rock Dam Ditch near the end of the concrete lining; and
(2) Subtracting:
- (i) Flows measured at the Truckee Canal near Hazen—USGS gauge number 10351400;
- (ii) The Carson River at Tarzyn Road near Fallon (below Sagouspe Dam) for satisfying water rights outside of the Project boundaries as described in § 418.25, USGS gauge number 10312275;
- (iii) Estimated losses in the Truckee Canal; and
- (iv) Spills, precautionary drawdown, and incentive water released at Lahontan Dam under §§ 418.24 and 418.36.