33 C.F.R. § 234.5
(a) Standard and scaled levels of analysis. Once a determination has been made that the PR&G does apply, the level of analysis shall be determined. The level of PR&G analysis required will vary in scope and magnitude across programs and activities. There are two levels of analysis: standard and scaled. In general, the level of analysis should be commensurate with the significance of the Federal investment in terms of dollar value and the potential environmental impacts. While there is not a clear distinction between the different levels of analysis, the two types of analysis can generally be distinguished in several ways:
(c) Scope and magnitude of analysis required. The threshold criteria for project, programmatic, and individual plan level analysis for Army Civil Works is shown in table 1 to this paragraph (c). These thresholds represent guidelines for the level of analysis that is likely to be most appropriate for an activity, given the level of investment in, appropriations for, or cost of that activity. In determining whether a given activity or project falls under or exceeds the financial thresholds, it is the level of the present value of Federal investment that is the relevant criterion to use. However, for a particular activity, a different level of analysis may be more appropriate, and projects/programs may depart from these guidelines where such a departure is justified. In general, a scoping effort should be undertaken to evaluate the level of effort needed to analyze the full range of potential effects. Project-level analysis should generally be used for water resources investments when the Corps has discretion in site-specific investment decisions. A programmatic-level analysis generally has a broader scale and/or scope than a project-level analysis. Programmatic-level analysis generally relates to funding programs or where a proposal for a set of similar actions analyzed under one decision document may occur.
| Type of activity | Totalinvestment($M) | Annual federalappropriations($M) | Level of analysis |
|---|---|---|---|
| ProjectsProposed Corps investments in water resources, such as infrastructure, ecosystem restoration, new construction, modifications or replacements to existing facilities, and operations and maintenance | >3015-30<15 | Standard analysis.Scaled analysis.Excluded. | |
| Programs | >10050-100<50 | Standard analysis.Scaled analysis.Excluded. | |
| Individual PlansManagement plans, such as watershed, master, etc. | >5010-50<10 | Standard analysis.Scaled analysis.Excluded. |