(a) To show compliance with the Act and this subchapter, the licensee must submit to the Commandant (CG-5P) or accepted Certifying Entity (CE) at least three copies of:
- (1) Each construction drawing and specification; and
- (2) Each revision to a drawing and specification.
- (b) Each drawing, specification, and revision under paragraph (a) of this section must bear the seal, or a facsimile imprint of the seal, of the registered professional engineer responsible for the accuracy and adequacy of the material.
- (c) Each drawing must identify the baseline design standard used as the basis for design.