29 C.F.R. § 1926.858

Removal of steel construction.

Published Apr 23, 201378 FR 23843
  1. (a) When floor arches have been removed, planking in accordance with § 1926.855(b) shall be provided for the workers engaged in razing the steel framing.
  2. (b) Cranes, derricks, and other hoisting equipment. Employers must meet the requirements specified in subparts N and CC of this part.
  3. (c) Steel construction shall be dismantled column length by column length, and tier by tier (columns may be in two-story lengths).
  4. (d) Any structural member being dismembered shall not be overstressed.

[44 FR 8577, Feb. 9, 1979 , 75 FR 48135, Aug. 9, 2010; 77 FR 49730, Aug. 17, 2012; 78 FR 23843, Apr. 23, 2013]