(c) Pile driving equipment.
- (1) Engineers and winchmen shall accept signals only from the designated signalmen.
- (2) All employees shall be kept clear when piling is being hoisted into the leads.
- (3) When piles are being driven in an excavated pit, the walls of the pit shall be sloped to the angle of repose or sheet-piled and braced.
- (4) When steel tube piles are being “blown out”, employees shall be kept well beyond the range of falling materials.
- (5) When it is necessary to cut off the tops of driven piles, pile driving operations shall be suspended except where the cutting operations are located at least twice the length of the longest pile from the driver.
- (6) When driving jacked piles, all access pits shall be provided with ladders and bulkheaded curbs to prevent material from falling into the pit.