1. General. These procedures are published pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Environmental Quality Improvement Act of 1970, as amended (42 U.S.C. 4371 et seq.). Section 309 of the Clean Air Act, as amended (42 U.S.C. 7609), and Executive Order 11514, Protection and Enhancement of Environmental Quality (March 5, 1970, as amended by Executive Order 11991, May 24, 1977).
2. Purpose. These procedures shall apply to efforts associated with the leasing, purchase, design, construction, and maintenance of new and existing INS facilities. All activities concerning the Immigration and Naturalization Service's compliance with NEPA shall be coordinated with Central Office Engineering staff.
3. Agency Description. The INS administers and enforces the immigration and nationality laws. This includes determining the admissibility of persons seeking entry into the United States and adjudicating requests for benefits and privileges under the immigration and nationality laws. The enforcement actions of INS involve the prevention of illegal entry of persons into the United States and the investigation and apprehension of aliens already in the country who because of inadmissibility at entry or misconduct committed following entry may be subject to deportation.
In carrying out its statutory enforcement responsibilities. the INS is authorized to arrest and detain aliens believed to be deportable and to effectuate removal from the U.S. of aliens found deportable after hearing.
4. Designation of Responsible Official. The Chief Engineer, Facilities and Engineering Branch shall be the liaison official for INS with the Council on Environmental Quality, the Environmental Protection Agency, and the other departments and agencies concerning environmental matters. Duties of the Chief Engineer include:
(d) Participating in policy formulation, as necessary, in the application of the requirements of the National Environmental Policy Act of 1969.
5. NEPA and INS Planning. (a) INS will make available to the public proposals and feasibility studies for facilities under consideration for possible use as INS facilities.
(c) Upon completion of the preliminary groundwork described above, INS will issue an A-95 Letter of Intent to:
(2) File an Environmental Impact Statement (EIS). (Reference: 1501.2—CEQ Regulations.)
6. Public Involvement. Information regarding the policies of INS for implementing the NEPA process can be obtained from: Immigration and Naturalization Service, Facilities and Engineering Branch, 425 I Street NW., Washington, DC 20536. (Reference: Part 1506.6(3)—CEQ Regulations.)
7. Supplemental Statements. If it is necessary to prepare a supplement to a draft or a Final Environmental Impact Statement, the supplement shall be introduced into the administrative record pertaining to the project. (Reference: Part 1502.9(c)(3)—CEQ Regulations.)
8. INS Decisionmaking Procedure. (a) Policy—(1) The Chief Engineer will consider all practical means, including the “no-action” alternative and other alternatives to the proposed action, which will enhance, protect, and preserve the quality of the environment, restore environmental quality previously lost, and minimize and mitigate unavoidable adverse effects. He will analyze and study the environment together with engineering, economic, social and other considerations to insure balanced decisionmaking in the overall public interest.
(b) Preparation of the environmental impact statements.
(3) When inclusion of certain voluminous data in an EIS would prove to be impractical, INS will summarize the data and retain the original material as a part of its administrative record for the project. This material will be made available to the public in a central place to be designated in the EIS, and upon written request or court order, copies of specified material will be provided. A charge for the reproduction of records may be made in accordance with current Department of Justice guidelines. (Reference: Part 1505 CEQ Regulations.)
9. Actions Which Normally Do Require Environmental Impact Statements: (a) Construction of a new INS facility which would have a significant impact upon the environment.
(b) Construction of a new addition to an existing INS facility which would significantly affect the physical capacity and which would have a significant impact upon the environment. (Reference: § 1507.3(b)(2)(i)—CEQ Regulations.)
10. Actions Which Normally Do Not Require Either An Environmental Impact Statement Or An Environmental Assessment: (a) Construction projects for existing facilities including but not limited to: Remodeling; replacement of building systems and components; maintenance and operations repairs and general improvements when such projects do not significantly alter the initial occupancy and program of the facility or significantly impact upon the environment.
(b) Increase or decrease in population of a facility within its physical capacity. (Reference: Part 1507.3(b)(2)(ii) and Part 1508.4—CEQ Regulations.)
11. Actions Which Normally Require An Environmental Assessment But Not Necessarily Environmental Impact Statements: