24 C.F.R. § 3285.304
(a) Concrete blocks. Installation instructions for concrete block piers must be developed in accordance with the following provisions and must be consistent with Figures A and B to § 3285.306.
(b) Caps.
(c) Gaps. Any gaps that occur during installation between the bottom of the main chassis beam and foundation support system must be filled by: