- (a) During construction activities, TVA shall require that appropriate erosion and sediment control measures be utilized to prevent pollution of the waters of the reservoir.
- (b) All material which accumulates behind sediment control structures must be removed from TVA land and placed at an upland site above the 100-year floodplain elevation or the Flood Risk Profile Elevation (whichever is applicable).
- (c) Disturbed sites must be promptly stabilized with seeding, vegetative planting, erosion control netting, and/or mulch material.