18 C.F.R. § 270.305
(b) Guidelines for designating tight formations. A jurisdictional agency determination designating a portion of a formation as a tight formation must be made in accordance with the following guidelines:
(2) Within the geographic boundaries of the portion of the formation being recommended for tight formation designation, the stabilized production rate of natural gas, against atmospheric pressure, of wells completed for production in such portion of such formation, without stimulation, is not expected to exceed the production rate determined in accordance with the table in this paragraph (b)(2). Such expected stabilized, pre-stimulation production rate is to be determined through an arithmetic mean averaging of the known stabilized, pre-stimulation production rates obtained from the wells that penetrate, and have a pay section in, such portion of such formation.
| If the average depth to the top of the formation (in feet) | The maximum allowable production rate of natural gas (in Mcf per day) | |
|---|---|---|
| exceeds— | but does notexceed— | may not exceed— |
| 0 | 1,000 | 44 |
| 1,000 | 1,500 | 51 |
| 1,500 | 2,000 | 59 |
| 2,000 | 2,500 | 68 |
| 2,500 | 3,000 | 79 |
| 3,000 | 3,500 | 91 |
| 3,500 | 4,000 | 105 |
| 4,000 | 4,500 | 122 |
| 4,500 | 5,000 | 141 |
| 5,000 | 5,500 | 163 |
| 5,500 | 6,000 | 188 |
| 6,000 | 6,500 | 217 |
| 6,500 | 7,000 | 251 |
| 7,000 | 7,500 | 290 |
| 7,500 | 8,000 | 336 |
| 8,000 | 8,500 | 388 |
| 8,500 | 9,000 | 449 |
| 9,000 | 9,500 | 519 |
| 9,500 | 10,000 | 600 |
| 10,000 | 10,500 | 693 |
| 10,500 | 11,000 | 802 |
| 11,000 | 11,500 | 927 |
| 11,500 | 12,000 | 1,071 |
| 12,000 | 12,500 | 1,238 |
| 12,500 | 13,000 | 1,432 |
| 13,000 | 13,500 | 1,655 |
| 13,500 | 14,000 | 1,913 |
| 14,000 | 14,500 | 2,212 |
| 14,500 | 15,000 | 2,557 |
(c) Notice to the Commission. Any jurisdictional agency making a determination that a formation, or portion thereof, qualifies as a tight formation will provide timely notice, in writing, of such determination, to the Commission. Such notice shall include the following to substantiate the jurisdictional agency's findings:
(2) Geological and engineering data to support the determination, including (but not limited to):