10 C.F.R. § 435.200
(a) New EISA-Subject buildings.
(1) New Federal buildings that are low-rise residential buildings, for which design for construction began on or after May 1, 2025, must be designed to meet the requirements of paragraph (c) of this section if:
(b) Major renovations of EISA-Subject buildings.
(c) Federal buildings that are of the type included in Appendix A of this subpart—(1) New Construction and Major Renovations of all Scope 1 Fossil Fuel-Using Systems in an EISA-Subject Building.
(i) Design for construction began during FY 2024 through FY 2029. For new construction or major renovations of all fossil fuel-using systems in an EISA-subject building, for which design for construction or renovation, as applicable, began during FY 2024 through 2029, the Scope 1 fossil fuel-generated energy consumption of the proposed building, based on the building design and calculated according to § 435.201(a), must not exceed the value identified in Tables A-1a to A-2a (if targets based on Scope 1 emissions are used) or Tables A-1b to A-2b (if targets based on kBtu of fossil fuel usage are used) of Appendix A of this subpart for the associated building type, climate zone, and fiscal year in which design for construction began.
(B) To calculate the shift adjustment multiplier, agencies shall estimate the number of shifts for their new building and multiply by the appropriate factor shown below in Table 1 for their building type. The Scope 1 fossil fuel-generated energy consumption target for the building would be the value in either Tables A-1a to A-2a or Tables A-1b to A-2b multiplied by the multiplier calculated in the previous sentence.
| Building activity/type | Weekly hours of operation | ||
|---|---|---|---|
| 50 or less | 51 to 167 | 168 | |
| Admin/professional office | 1 | 1 | 1.4 |
| Bank/other financial | 1 | 1 | 1.4 |
| Government office | 1 | 1 | 1.4 |
| Medical office(non-diagnostic) | 1 | 1 | 1.4 |
| Mixed-use office | 1 | 1 | 1.4 |
| Other office | 1 | 1 | 1.4 |
| Laboratory | 1 | 1 | 1.4 |
| Distribution/shipping center | 0.7 | 1.4 | 2.1 |
| Nonrefrigerated warehouse | 0.7 | 1.4 | 2.1 |
| Convenience store | 1 | 1 | 1.4 |
| Convenience store with gas | 1 | 1 | 1.4 |
| Grocery store/food market | 1 | 1 | 1.4 |
| Other food sales | 1 | 1 | 1.4 |
| Fire station/police station | 0.8 | 0.8 | 1.1 |
| Other public order and safety | 0.8 | 0.8 | 1.1 |
| Medical office (diagnostic) | 1 | 1 | 1.5 |
| Clinic/other outpatient health | 1 | 1 | 1.5 |
| Refrigerated warehouse | 1 | 1 | 1 |
| Religious worship | 0.9 | 1.7 | 1.7 |
| Entertainment/culture | 0.8 | 1.5 | 1.5 |
| Library | 0.8 | 1.5 | 1.5 |
| Recreation | 0.8 | 1.5 | 1.5 |
| Social/meeting | 0.8 | 1.5 | 1.5 |
| Other public assembly | 0.8 | 1.5 | 1.5 |
| College/university | 0.8 | 1.3 | 1.3 |
| Elementary/middle school | 0.8 | 1.3 | 1.3 |
| High school | 0.8 | 1.3 | 1.3 |
| Preschool/daycare | 0.8 | 1.3 | 1.3 |
| Other classroom education | 0.8 | 1.3 | 1.3 |
| Fast food | 0.4 | 1.1 | 2.1 |
| Restaurant/cafeteria | 0.4 | 1.1 | 2.1 |
| Other food service | 0.4 | 1.1 | 2.1 |
| Hospital/inpatient health | 1 | 1 | 1 |
| Nursing home/assisted living | 1 | 1 | 1 |
| Dormitory/fraternity/sorority | 1 | 1 | 1 |
| Hotel | 1 | 1 | 1 |
| Motel or inn | 1 | 1 | 1 |
| Other lodging | 1 | 1 | 1 |
| Vehicle dealership/showroom | 0.8 | 1.2 | 1.8 |
| Retail store | 0.8 | 1.2 | 1.8 |
| Other retail | 0.8 | 1.2 | 1.8 |
| Post office/postal center | 0.7 | 1.5 | 1.5 |
| Repair shop | 0.7 | 1.5 | 1.5 |
| Vehicle service/repair shop | 0.7 | 1.5 | 1.5 |
| Vehicle storage/maintenance | 0.7 | 1.5 | 1.5 |
| Other service | 0.7 | 1.5 | 1.5 |
| Strip shopping mall | 1 | 1 | 1 |
| Enclosed mall | 1 | 1 | 1 |
| Bar/Pub/Lounge | 1 | 1 | 1.4 |
| Courthouse/Probation Office | 1 | 1 | 1.4 |
(2) Mixed-use buildings. For buildings that combine two or more building types with process loads or, alternatively, that combine one or more building types with process loads with one or more building types in Tables A-1a toA-2a or A-1b to A-2b of appendix A of this subpart, the maximum allowable Scope 1 fossil fuel-generated energy consumption of the proposed building is equal to the averaged process load building values determined under paragraph (d)(1) of this section and the applicable building type values in Tables A-1a toA-2a or A-1b to A-2b of appendix A of this subpart, weighted by floor area. Equation 1 shall be used for mixed use buildings.
Equation 1: Scope 1 Fossil fuel generated energy consumption for a mixed-use building = the sum across all building uses of (the fraction of total floor building floor area for building use i times the allowable fossil fuel-generated energy consumption for building use i)
Equation 1 may be rewritten as:
