Cal. Pub. Util. Code § 2827.10
(a) As used in this section, the following terms have the following meanings:
(2) “Eligible fuel cell electrical generating facility” means a facility that includes the following:
(3)
(A) “Eligible fuel cell customer-generator” means a customer of an electrical corporation that meets all the following criteria:
(b)
(c)
(e)
(f) The net metering calculation shall be made by measuring the difference between the electricity supplied to the eligible fuel cell customer-generator and the electricity generated by the eligible fuel cell customer-generator and fed back to the electrical grid over a 12-month period. The following rules apply to the annualized metering calculation:
(2) At the end of each 12-month period, where the electricity supplied during the period by the electrical corporation exceeds the electricity generated by the eligible fuel cell customer-generator during that same period, the eligible fuel cell customer-generator is a net electricity consumer and the electrical corporation shall be owed compensation for the eligible fuel cell customer-generator’s net kilowatthour consumption over that same period. The compensation owed for the eligible fuel cell customer-generator’s consumption shall be calculated as follows: