Cal. Pub. Util. Code § 740.16
(a)
(1) The Legislature finds and declares all of the following:
(b)
(1) For purposes of this section, “electric vehicle grid integration” means any method of altering the time, charging level, or location at which grid-connected electric vehicles charge or discharge, in a manner that optimizes plug-in electric vehicle interaction with the electrical grid and provides net benefits to ratepayers by doing any of the following:
(c) By December 31, 2020, in an existing proceeding, the commission shall establish strategies and quantifiable metrics to maximize the use of feasible and cost-effective electric vehicle grid integration by January 1, 2030, consistent with all of the following:
(d) As part of each local publicly owned electric utility’s integrated resource plan update adopted on and after January 1, 2020, pursuant to Section 9621, the local publicly owned electric utility shall consider both of the following: