Cal. Pub. Res. Code § 3180
(b) On or before January 1, 2018, the operators of all gas storage wells shall have commenced a mechanical integrity testing regime specified by the division. The testing regime shall include all of the following:
(d)
(3) In developing the regulations, the division shall consider enhanced design, construction, and maintenance measures that could meet the standard in paragraph (2), including any of the following: