New or expanded tanker terminals shall be designed and constructed to do all of the following:
- (a) Minimize the total volume of oil spilled.
- (b) Minimize the risk of collision from movement of other vessels.
- (c) Have ready access to the most effective feasible oilspill containment and recovery equipment.
- (d) Have onshore deballasting facilities to receive any fouled ballast water from tankers where operationally or legally required.