Cal. Pub. Res. Code § 21080.47
(a) For purposes of this section, the following definitions apply:
(6)
(A) “Project” means either of the following:
(i) A project that consists solely of the installation, repair, or reconstruction of one or more of the following:
(B) “Project” does not include either of the following categories of projects:
(8) “Public water system” means a system for the provision of water for human consumption through pipes or other constructed conveyances that has 15 or more service connections or regularly serves at least 25 individuals daily at least 60 days out of the year, and shall include, but not be limited to, any of the following:
(b)
(1) This division does not apply to a project that meets the requirements of subdivision (c) and subdivision (d) or (e), as appropriate, and that primarily benefits a small disadvantaged community water system or a state small water system in any of the following ways:
(c) The project meets all of the following:
(d)
(2) Paragraph (1) does not apply if any of the following requirements are met:
(e) For a project undertaken by a private entity that is exempt from this division pursuant to this section, the project applicant shall do both of the following:
(1) Certify to the lead agency that either of the following is true:
(B) If the project is not in its entirety a public work, all construction workers employed in the execution of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the project is subject to this subparagraph, then, for those portions of the project that are not a public work, all of the following shall apply:
(iii)
(2) Certify to the lead agency that a skilled and trained workforce will be used to perform all construction work on the project. All of the following requirements shall apply to the project:
(C)