Cal. Lab. Code § 7955
The division and the owner of a mine, if he is not the operator of the mine, shall be notified before any initial mining operation or construction may be started at any mines or tunnels. A prejob safety conference shall be held with an authorized representative of the division for all underground operations. Representatives of the tunnel or mine owner, the employer, and employees shall be included in the prejob safety conference.
(d) Extrahazardous, which classification may, when the division finds that there is a serious danger to the safety of the employees, be applied to tunnels or underground mines where gas or vapors have caused an explosion or fire, where the likelihood of encountering petroleum vapors exists, or where tests show, with normal ventilation, a concentration of hydrocarbon petroleum vapors in excess of 20 percent of the lower explosive limit within three inches of the roof, face, floor, or walls of any open workings. Construction in extrahazardous tunnels or operation in extrahazardous underground mines shall conform to safety measures set forth in Sections 7977 to 7985, inclusive, any rules, regulations, orders, or special orders of the division, or any special rules, orders, or regulations adopted by the board.
The division shall not be required to reclassify any tunnel or underground mine that is shut down seasonally, when such tunnel or underground mine is put back into operation in not less than six months after date of the shutdown.
The division shall classify all tunnels or underground mines operating on the effective date of this section, or which commence operation thereafter, as one of the classifications set forth in subdivisions (a) to (d), inclusive. Such classification shall be made prior to the request for bids on all public works projects, whenever possible. This shall not, however, prevent the division from reclassifying such mines or tunnels when conditions warrant it.