- (a) An audible emergency warning system shall be installed in kraft and soda base sulfite recovery furnace areas.
- (b) Smelt-dissolving tanks shall be covered at all times except when samples are being taken.
- (c) Exhaust ventilation shall be designed, installed and maintained where niter cake is fed into a rotary furnace to ensure the concentration of hydrogen sulfide gas permissible exposure limit (PEL) meets the requirements of Article 107.
- (d) Pressure tank accumulators shall be inspected twice annually. A record of the inspection, including the date and name of the person who made the inspection, shall be kept on file in the plant.
Note: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code.
History
1. Repealer and new section filed 9-15-86; effective thirtieth day thereafter (Register 86, No. 38).