Cal. Code Regs. tit. 8, § 4928.1
(a) Boom hoist and load hoist free fall prohibitions.
(1) The use of equipment in which the boom, or hoist line in use, is configured to free fall (live boom/live hoist line) is prohibited in each of the following circumstances:
(C) The load or boom is directly over a power line, or over any part of the area extending the Table A of Section 5003.1 clearance distance to each side of the power line; or any part of the area extending the Table A clearance distance to each side of the power line is within the radius of vertical travel of the boom or the load.
Note to (a)(1)(C): Operations in proximity to overhead lines are also subject to Section 2946.
(2) The use of equipment in which the boom is configured to free fall (live boom) is permitted only where none of the circumstances listed in subsection (a)(1) are present and:
(b) Preventing boom free fall (Controlled Load Lowering). Where the use of equipment with a boom that is configured to free fall (live boom) is prohibited, the boom shall have a secondary mechanism or device designed to prevent the boom free fall in the event the primary system used to hold or regulate the boom hoist fails, as follows:
(1) Friction drums shall have:
(c) Load line free fall prohibitions. In each of the following circumstances, controlled load lowering is required and free fall of the load line hoist is prohibited:
(3) The load or boom is directly over a power line, or over any part of the area extending the Table A of Section 5003.1 clearance distance to each side of the power line; or any part of the area extending the Table A clearance distance to each side of the power line is within the radius of vertical travel of the boom or the load.
Note to (c)(3): Operations in proximity to overhead lines are also subject to Section 2946.
Note: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code.
1. New section filed 7-26-2022; operative 7-26-2022 pursuant to Government Code section 11343.4(b)(3) (Register 2022, No. 30). Filing deadline specified in Government Code section 11349.3(a) extended 60 calendar days pursuant to Executive Order N-40-20 and an additional 60 calendar days pursuant to Executive Order N-71-20.