(d) Multiply the square footage obtained in the calculation described in subsection (c) by either the design wind load of the MH-unit or by fifteen (15) psf, whichever is greater, to obtain the wind load. The design wind load of the MH-unit is provided on the data plate permanently affixed to the MH-unit.
EXAMPLE: The side wall of the MH-unit measures sixty-two and one-half feet (62 ½ ′) in length and ten feet (10′) in height. The roof of the MH-unit measures sixty-three and one-half feet (62 ½ ′) in length and four and one-third feet (4 ⅓ ′) in height. These measurements result in a calculated wind load of 11,437 pounds using the above-described method.
Wind load is calculated as follows:
Note: Authority cited: Sections 18300, 18613 and 18613.4, Health and Safety Code. Reference: Section 18613.4, Health and Safety Code.
1. Renumbering of former section 1336 to section 1335 and new section filed 9-8-94 as an emergency; operative 9-19-94 (Register 94, No. 36). A Certificate of Compliance must be transmitted to OAL by 1-17-95 or emergency language will be repealed by operation of law on the following day.
2. Renumbering of former section 1336 to section 1335 and new section refiled 1-18-95 as an emergency; operative 1-17-95 (Register 95, No. 3). A Certificate of Compliance must be transmitted to OAL by 5-17-95 or emergency language will be repealed by operation of law on the following day.
3. Certificate of Compliance as to 1-18-95 order transmitted to OAL 3-31-95 and filed 5-12-95 (Register 95, No. 19).
4. Amendment of section and Note filed 7-6-2004; operative 7-6-2004 pursuant to Government Code section 11343.4 (Register 2004, No. 28).