(a) The following are standard terms and conditions included in any approval of a dam safety application:
- (1) Construction work shall be started within one year from date of approval.
- (2) No foundations or abutments shall be covered by the material of the dam until the Department has been given an opportunity to inspect and approve the same.
- (b) General Safety Requirement. In addition to the above terms and conditions, the law requires that a dam shall at all times be designed, constructed, operated and maintained so that it shall not or would not constitute a danger to life or property, and the Department may, at any time, exercise any discretion with which it is vested, or take any action necessary to prevent such danger.
Note: Authority cited: Section 6078, Water Code. Reference: Sections 6075 and 6260-6267, Water Code.
History
1. Editorial correction renumbering former section 312 to section 313 and renumbering of former section 311 to section 312 filed 12-8-83 (Register 83, No. 50). For prior history, see Register 83, No. 32.
2. Editorial correction of History (Register 91, No. 24).