- (a) Applicable regulations are revised;
- (b) The plan fails in an emergency;
- (c) The generator facility changes -- in its design, construction, operation, maintenance, or other circumstances -- in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;
- (d) The list of emergency coordinators changes; or
- (e) The list of emergency equipment changes.
The contingency plan shall be reviewed, and immediately amended, if necessary, whenever:
Note: Authority cited: Sections 208, 25150 and 25159, Health and Safety Code. Reference: Sections 25159 and 25159.5, Health and Safety Code; and 40 CFR Section 262.263.
History
1. New section filed 5-6-2024; operative 7-1-2024 (Register 2024, No. 19).