(a) No later than six months after the end of each calendar year, a DiPRRA shall provide an annual report to the State Board and to each public water system receiving DPR project water that contains the following:
- (1) A summary of the compliance status of the DPR project with the requirements of this Article and the permit issued pursuant to section 64669.15 during the previous calendar year, and a list of violation(s) and corrective action(s) taken;
- (2) A summary plant shutdown(s) and diversion(s) that occurred during the previous calendar year, and the corrective action(s) taken;
- (3) A description of the entire treatment train performance and operational challenges during the previous calendar year, and any proposed revisions to the operations plan;
- (4) A description of the wastewater source control program performance and any challenges during the previous calendar year, and any proposed program changes;
- (5) A description of the assessments and investigations and results of the assessments and investigations performed pursuant to section 64669.40(a), and a summary of local limits and other discharge control methods established pursuant to section 64669.40(b);
- (6) A description of anticipated treatment change(s), along with an evaluation of the expected impact of the change(s) on subsequent treatment process(es);
- (7) Any expected change(s) in quantity and quality of the municipal wastewater.
- (b) The DiPRRA shall post the Annual Report on the DiPRRA internet website.
Note: Authority cited: Sections 13521 and 13561.2, Water Code; and Sections 116271, 116350 and 116375, Health and Safety Code. Reference: Sections 13561, 13561.2 and 13567, Water Code; and Sections 116275 and 116375, Health and Safety Code.
History
1. New section filed 8-6-2024; operative 10-1-2024 (Register 2024, No. 32).