Cal. Code Regs. tit. 17, § 95486.3
Generating and Calculating Credits for ZEV Fueling Infrastructure Pathways for Light- and Medium-Duty Vehicles.
Effective Jul 1, 2025Register 2025, No. 26Authority cited: Sections 38510, 38530, 38560, 38560.5, 38562.2, 38571, 38580, 39600, 39601, 41510, 41511 and 43018, Health and Safety Code. Reference: Sections 38501, 38510, 39515, 39516, 38571, 38580, 39000, 39001, 39002, 39003, 39515, 39516, 41510, 41511 and 43000, Health and Safety Code; Section 25000.5, Public Resources Code; 42 U.S.C. Section 7545; and Western Oil and Gas Ass'n v. Orange County Air Pollution Control District, 14 Cal.3d 411, 121 Cal.Rptr. 249 (1975).State of California
(a) Hydrogen Refueling Infrastructure (HRI) Pathways for light- and medium-duty (LMD) hydrogen refueling stations.
(1) HRI Pathway Eligibility. A hydrogen station owner or their designee identified in section 95483(b)(2) may submit a LMD-HRI application to certify an HRI pathway subject to the following eligibility conditions:
- (A) The proposed LMD-HRI station must be located in California.
- (B) The HRI pathway application must be received on or before December 31, 2030.
(C) The following stations are not eligible for HRI crediting as LMD-HRI stations:
- 1. Any station that is permitted to operate prior to January 1, 2022; or
- 2. Any station previously approved for HRI crediting; or
- 3. Any station receiving or spending funds pursuant to any settlement related to any California or Federal regulation enforcement; or
- 4. Any station built as a required mitigation measure pursuant to the California Environmental Quality Act; or
- 5. Any LMD station co-located with a HD-HRI station that is not a public LMD-HRI station.
(2) LMD-HRI Application Requirements. For each LMD hydrogen refueling station, the station owner must submit an application in the LRT-CBTS containing the following information:
- (A) Name and address of the owner of the proposed station.
(B) Contact person for the owner entity:
- 1. Name;
- 2. Title or position;
- 3. Phone number;
- 4. Mobile phone number;
- 5. Email address.
- (C) Name, street address, latitude, longitude, and a location description for the proposed station.
- (D) Expected daily permitted hours of operation for the station. If the daily permitted hours are less than 24 hours, the applicant must provide documentation from a permitting authority demonstrating that daily permitted hours for the station are limited.
- (E) The station nameplate refueling capacity for the permitted hours of operation calculated using HyCap (March 12, 2025), which is incorporated herein by reference, or an equivalent model or capacity estimation methodology approved by the Executive Officer. The applicant must submit a completed model with the application.
(F) The LMD-HRI refueling capacity for a LMD-HRI station is calculated using the following equation:
)
where:
)
is the HRI refueling capacity (kg/day) for the LMD-HRI station; and
)
is the factor applied to the station based on LMD-HRI site type:
• For a public LMD-HRI station, 62.5%
• For a private LMD-HRI station, 31.5%
)
is the nameplate refueling capacity for the LMD-HRI station determined in subsection (E) above or 1,200 kg/day, whichever is less.
- (G) The number of dispensing units at the station.
- (H) Expected source(s) of hydrogen, CI value(s), and method(s) used for delivery.
- (I) Expected date that the station will be operational.
(J) A signed attestation letter from the applicant attesting to the veracity of the information in the application packet. The attestation letter must be submitted as an electronic copy, be on company letterhead, be signed by an officer of the applicant with authority to attest to the veracity of the information in the application and to sign on behalf of the applicant, be from the applicant and not from an entity representing the applicant (such as a consultant or legal counsel), and include the following attestation:
I, an authorized representative of _______________ (applicant entity), attest to the veracity of the information submitted as part of the Light- and Medium-Duty Hydrogen Refueling Infrastructure (LMD-HRI) application, attest that the proposed station is not receiving funds pursuant to any enforcement settlement related to any California or Federal regulation, and declare that the information submitted accurately represents the anticipated and intended design and operation of the hydrogen refueling station. Further, I understand and agree to each of the statements in the attached application. I am a duly authorized officer with authority to attest to the veracity of the information in the application and to sign on behalf of the respective applicant.
I understand that the following information in the LMD-HRI application will be made available on the LCFS website: Name of the Applicant Entity, Station Name, Station Owner, Station Address, Number of Dispensing Units, LMD-HRI Refueling Capacity, Publicly Accessible Hours, and Effective Date Range for HRI Crediting.
By submitting this application, _____________________________________________ (applicant entity) accepts responsibility for the information herein provided to CARB. I certify under penalty of perjury under the laws of the State of California that I have personally examined, and am familiar with, the statements and information submitted in this document. I certify that the statements and information submitted to CARB are true, accurate, and complete.
Signature
Print Name & Title
Date
- (K) CBI must be designated pursuant to the requirements described in section 95488.8(c).
- (L) An application and supporting documents must be submitted electronically via the LRT-CBTS unless the Executive Officer has approved or requested in writing another format.
(3) Application Approval Process.
(A) The LMD-HRI application must be approved by the Executive Officer before the station may generate HRI credits. LMD-HRI applications will be evaluated for approval on a first come, first served basis.
- 1. If estimated potential HRI credits from all approved HRI and LMD-HRI stations exceed 2.5 percent of deficits in the prior quarter, the Executive Officer will not approve additional HRI pathways for LMD-HRI stations and will not accept additional LMD-HRI applications until estimated potential HRI credits for approved HRI and LMD-HRI stations are less than 2.5 percent of deficits.
- 2. If estimated potential HRI credits from an individual applicant's approved HRI and LMD-HRI stations exceed 1 percent of deficits in the most recent quarter for which data is available, the Executive Officer will not approve additional HRI pathways for that applicant's LMD-HRI stations and will not accept additional LMD-HRI applications from that applicant until the applicant's estimated potential HRI credits for that applicant's approved HRI and LMD-HRI stations are less than 1 percent of deficits.
(B) Estimated potential HRI credits for LMD-HRI stations will be calculated using the following equation:
)
where:
)
means the estimated potential HRI credits from all approved HRI and LMD-HRI stations;
)
means the total HRI credits generated by operational HRI and LMD-HRI stations in the most recent quarter for which data is available;
)
means the total HRI and LMD-HRI capacity of HRI and LMD-HRI stations that were operational in the prior quarter; and
)
means the total HRI and LMD-HRI capacity of all approved HRI and LMD-HRI stations, both operational and nonoperational.
(C) The estimated potential HRI credits for HRI and LMD-HRI stations for an individual applicant will be calculated using the same equation as specified in subsection (B) above, where:
)
means the estimated potential HRI credits from the applicant's approved HRI and LMD-HRI stations;
)
means the total HRI credits generated by the applicant's operational HRI and LMD-HRI stations in the most recent quarter for which data is available;
)
means the total HRI and LMD-HRI capacity of the applicant's stations that were operational in the most recent quarter for which data is available; and
)
means the total HRI and LMD-HRI capacity of the applicant's approved stations, both operational and nonoperational.
(D) After receipt of an application designated by the applicant as ready for formal evaluation, the Executive Officer will advise the applicant in writing either that:
- 1. The application is complete, or
2. The application is incomplete, in which case the Executive Officer will identify which requirements of section 95486.3(a)(2) have not been met.
- a. The applicant may submit additional information to correct deficiencies identified by the Executive Officer.
- b. If the applicant is unable to achieve a complete application in the quarter of the Executive Officer's receipt of the original application, the application will be denied on that basis, and the applicant will be informed in writing. The applicant may submit a new application for the station.
- 3. At any point during the application evaluation process, the Executive Officer may request in writing additional information or clarification from the applicant.
- (E) The Executive Officer will not approve an application if the Executive Officer determines, based upon the information submitted in the application and any other available information, that the application does not meet requirements in subsections 95486.3(a)(1) and (a)(2). If the Executive Officer does not approve the application, the applicant will be notified in writing and the basis for the disapproval shall be identified.
- (F) If the Executive Officer determines that the applicant and application have met all requirements for approval pursuant to subsections 95486.3(a)(1) and (a)(2), the Executive Officer will approve the application and provide an approval summary on the LCFS website including the LMD-HRI station location and assigned identifier, number of dispensing units, LMD-HRI refueling capacity, and effective date range for HRI pathway crediting.
- (G) Crediting Period. HRI crediting for LMD-HRI stations is limited to 10 years starting with the quarter the Executive Officer approves the LMD-HRI application.
(4) Requirements to Generate HRI Credits. To generate credits using the HRI pathway, the LMD-HRI station must meet the following conditions. The applicant must maintain, and submit to CARB upon request, records demonstrating adherence to these conditions.
- (A) The applicant must update the LMD-HRI refueling capacity if different from the design LMD-HRI refueling capacity provided in the application. Any station design or operational information that deviates from the original LMD-HRI application must be declared to the Executive Officer, and a new attestation must be submitted pursuant to section 95486.3(a)(2)(J).
- (B) For a LMD-HRI station available to the public, no obstructions or obstacles exist to preclude vehicle operators from entering the station premises, no access cards or personal identification (PIN) codes are required for the station to dispense fuel, and no formal or registered station training shall be required for individuals to use the hydrogen refueling station.
- (C) For a public LMD-HRI station that charges a fee for service, the station uses a public point of sale terminal that accepts major credit and debit cards.
(D) The station is connected to the Station Operational Status System (SOSS), is listed open for retail, and:
- 1. The station passed final inspection by the appropriate authority having jurisdiction and has a permit to operate.
- 2. The station owner has fully commissioned the station, and has declared it fit to service retail light- and medium-duty FCV drivers. This includes the station owner's declaration that the station meets an appropriate SAE fueling protocol.
- (E) All dispensers installed in the hydrogen refueling station have undergone type evaluation according to the California Type Evaluation Program (CTEP) administered by the California Department of Food and Agriculture/Division of Measurement Standards (CDFA/DMS) and have either a Temporary Use Permit or a type approval Certificate of Approval issued by CDFA/DMS. The FSE registration must be completed pursuant to section 95483.2(b)(8) and the quantity of dispensed hydrogen must be reported as required in section 95491. The station must dispense hydrogen in a given quarter to generate HRI credits.
(F) Dispensed hydrogen meets the following CI and renewable content requirements on a company-wide, weighted average basis. The Executive Officer will consider all the stations registered by an entity with a unique FEIN in the LRT-CBTS for calculating the company-wide weighted average CI and renewable content.
- 1. CI of 150 gCO2e/MJ or less before January 1, 2030, and 90 gCO2e/MJ or less thereafter, and
- 2. Renewable content of 40 percent or greater before January 1, 2030, and 80 percent thereafter.
- (G) If the applicant fails to demonstrate the operability within 24 months of approval and if the estimated potential HRI credits from HRI and LMD-HRI stations exceed 2.5 percent of deficits in the most recent quarter for which deficit data is available, then the application will be canceled. The applicant may submit a new application for the same LMD-HRI station the following quarter.
(5) Calculation of HRI Credits. HRI credits for LMD-HRI stations will be calculated using the following equation:
)
where:
)
is the average carbon intensity requirement of gasoline for a given year as provided in section 95484(d);
EERgasoline is the dimensionless Energy Economy Ratio for H2/FCV relative to gasoline as listed in Table 5;
CIHRI is the company-wide weighted average CI for dispensed hydrogen during the quarter or 0 g/MJ, whichever is greater;
EH2 is the energy density for hydrogen in MJ/kg as listed in Table 4;
CapLMD -- HRI is the HRI refueling capacity for the LMD-HRI station (kg/day);
N is the number of days during the quarter;
UT is the uptime multiplier which is the percentage of time that the LMD-HRI station is available as reported to SOSS during the quarter;
H2disp is the quantity of hydrogen dispensed during the quarter (kg);
C is a factor used to convert credits to units of metric tons from gCO2e and has the value of:
)
(6) Reporting and Recordkeeping Requirements. The following must be reported to the Executive Officer each quarter as set forth in section 95491 before credits will be issued to the LRT account associated with an approved HRI pathway.
- (A) Station availability. This is the percentage of hours the station is available for fueling during the quarter relative to the permitted hours of operation for the station, as reported to the SOSS. Any period of time that SOSS reports that a portion of the station capacity is not available will count as a pro-rated amount of station availability, proportional to the percentage of the station capacity that remains available for fueling for this period of time.
- (B) Company-wide, weighted average renewable content (percent) for dispensed hydrogen.
(C) Cost and revenue data. Provide an annual account of the following costs borne and revenues received by the station owner up through the most recent reporting quarter per station. The cost and revenue account must be included in the annual report submitted pursuant to section 95491.
- 1. Total capital expenditures ($), including a breakdown by equipment, labor, materials, land, and fees ($). Costs for on-site generation, land, working capital and off-site facilities are not included in the initial capital expenditure;
- 2. Total delivered cost ($) of hydrogen and average delivered cost ($/kg) for hydrogen;
- 3. Total maintenance costs ($);
- 4. Total land rental cost ($);
- 5. Total grant revenue or other external funding received towards capital expenditures ($);
- 6. Total grant revenue or other external funding received towards operational and maintenance expenditures ($);
- 7. Total revenue ($) received from sale of hydrogen and average retail price ($/kg) for hydrogen sold;
- 8. Other operational expenditures ($).
(b) DC Fast Charging Infrastructure (FCI) Pathways for Light- and Medium-Duty (LMD) Charging Sites.
(1) FCI Pathway Eligibility. An FSE owner or their designee identified in section 95483(c)(2)(B) may submit a LMD-FCI application to certify an FCI pathway subject to the following eligibility conditions:
- (A) The proposed FSE must be located in California.
- (B) The FCI pathway application must be received on or before December 31, 2030.
(C) The following FSE are not eligible for FCI crediting:
- 1. Any FSE that is permitted to operate prior to January 1, 2022; or
- 2. Any FSE previously approved for FCI crediting; or
- 3. Any FSE receiving or spending funds pursuant to any settlement related to any California or Federal regulation enforcement; or
- 4. Any FSE built as a required mitigation measure pursuant to the California Environmental Quality Act; or
- 5. Any LMD-FCI FSE co-located with a HD-FCI site that is not a public LMD-FCI FSE.
- (D) Each LMD-FCI FSE must have a minimum nameplate power rating of 50 kW.
- (E) Each LMD-FCI FSE must be networked and capable of monitoring and reporting its availability for charging.
(2) LMD-FCI Application Requirements. For each site of LMD-FCI FSEs at the same address, the applicant must submit an application in the LRT-CBTS containing the following information:
- (A) Name and address of the owner of the proposed FSEs.
(B) Contact person for the owner entity:
- 1. Name;
- 2. Title or position;
- 3. Phone number;
- 4. Mobile phone number;
- 5. Email address.
- (C) Name, street address, latitude, longitude and a location description for each proposed LMD-FCI site.
- (D) The number of FSEs.
- (E) The nameplate power rating (kW), FCI power rating (kW), connector type(s), and model for each FSE. The FCI power rating of the FSE can be less than the nameplate power rating to meet the requirements of subsection (F) below, but cannot exceed the nameplate power rating.
- (F) The total FCI power rating for all LMD-FCI FSEs claiming FCI credit at one address under this provision cannot exceed 2,500 kW.
- (G) The total site power (kW) available to the chargers at the site, including from the electric grid, battery energy storage, and on-site production. The total site power (kW) that can be supplied to all on-site FSEs must be greater than or equal to the sum of the FCI power rating of on-site FSEs certified to use the FCI pathway.
(H) The FCI charging capacity for each LMD-FCI FSE calculated using the following equation:
)
where:
)
is the FCI charging capacity (kWh/day) for the LMD-FCI FSE i
)
is the factor applied to the FSE based on LMD-FCI site type:
• For an FSE at a public LMD-FCI charging site, 20%
• For an FSE at a private LMD-FCI charging site, 10%
)
is the lesser of the FCI power rating for the LMD-FCI FSE or 350 kW.
24 is the number of hours in a day (hr/day)
- (I) Expected date that the FSE will be operational.
- (J) Expected daily permitted hours of operation for the site. If the daily permitted hours are less than 24 hours, the applicant must provide documentation from a permitting authority demonstrating that daily permitted hours for the FSE are limited.
(K) A signed attestation letter from the applicant attesting to the veracity of the information in the application packet. The attestation letter must be submitted as an electronic copy, be on company letterhead, be signed by an officer of the applicant with authority to attest to the veracity of the information in the application and to sign on behalf of the applicant, be from the applicant and not from an entity representing the applicant (such as a consultant or legal counsel), and include the following attestation:
I, an authorized representative of _______________ (proposed FSE owner entity), attest to the veracity of the information submitted as part of the Light- and Medium-Duty DC Fast Charging Infrastructure (LMD-FCI) application, attest that the proposed FSE is not receiving funds pursuant to any enforcement settlement related to any California or Federal regulation, and declare that the information submitted accurately represents the anticipated and intended design and operation of the charging infrastructure. Further, I understand and agree to each of the statements in the attached application. I am a duly authorized officer with authority to attest to the veracity of the information in the application and to sign on behalf of the respective applicant.
I understand that the following information in the LMD-FCI application will be made available on the LCFS website: Name of the Applicant Entity, Site Name, Site Owner, Site Address, Number and Type of Charging Units, Nameplate Power Rating for Each Unit, Publicly Accessible Hours, and Effective Date Range for FCI Crediting.
By submitting this application, _____________________________________________ (applicant entity) accepts responsibility for the information herein provided to CARB. I certify under penalty of perjury under the laws of the State of California that I have personally examined, and am familiar with, the statements and information submitted in this document. I certify that the statements and information submitted to CARB are true, accurate, and complete.
- (L) CBI must be designated pursuant to the requirements described in section 95488.8(c).
- (M) An application and supporting documents must be submitted electronically via the LRT-CBTS unless the Executive Officer has approved or requested in writing another format.
(3) Application Approval Process.
(A) The LMD-FCI application must be approved by the Executive Officer before the applicant may generate FCI credits. LMD-FCI applications will be evaluated for approval on a first come, first served basis.
- 1. If estimated potential FCI credits from all approved FCI and LMD-FCI FSEs exceed 2.5 percent of deficits in the most recent quarter for which data is available, the Executive Officer will not approve additional FCI pathways for LMD-FCI FSEs and will not accept additional LMD-FCI applications until estimated potential FCI credits for approved FCI and LMD-FCI FSEs are less than 2.5 percent of deficits.
- 2. If estimated potential FCI credits from an individual applicant's approved FCI and LMD-FCI FSEs exceed 0.5 percent of deficits in the most recent quarter for which data is available, the Executive Officer will not approve additional FCI pathways for that applicant's LMD-FCI FSEs and will not accept additional LMD-FCI applications from that applicant until the estimated potential FCI credits for that applicant's approved FCI and LMD-FCI FSEs are less than 0.5 percent of deficits.
(B) Estimated potential FCI credits for LMD-FCI FSEs will be calculated using the following equation:
)
where:
)
means the estimated potential FCI credits from all approved FCI and LMD-FCI FSEs;
)
means the total FCI credits generated by operational FCI and LMD-FCI FSEs in the most recent quarter for which data is available;
)
means the total FCI charging capacity of FCI and LMD-FCI FSEs that were operational in the most recent quarter for which data is available; and
)
means the total FCI charging capacity of all approved FCI and LMD-FCI FSEs, both operational and nonoperational.
(C) The estimated potential FCI credits for FCI and LMD-FCI FSEs for an individual applicant will be calculated using the same equation as in subsection (B) above, where:
)
means the estimated potential FCI credits from the applicant's approved FCI and LMD-FCI FSEs;
)
means the total FCI credits generated by the applicant for operational FCI and LMD-FCI FSEs in the most recent quarter for which data is available;
)
means the total FCI charging capacity of the applicant's FCI and LMD-FCI FSEs that were operational in the most recent quarter for which data is available; and
)
means the total FCI charging capacity of all of the applicant's approved FCI and LMD-FCI FSEs, both operational and nonoperational.
(D) After receipt of an application designated by the applicant as ready for formal evaluation, the Executive Officer shall advise the applicant in writing either that:
- 1. The application is complete, or
2. The application is incomplete, in which case the Executive Officer will identify which requirements of section 95486.3(b)(2) have not been met.
- a. The applicant may submit additional information to correct deficiencies identified by the Executive Officer.
- b. If the applicant is unable to achieve a complete application during the quarter of the Executive Officer's receipt of the original application, the application will be denied on that basis, and the applicant will be informed in writing. The applicant may submit a new application for the station.
- 3. At any point during the application evaluation process, the Executive Officer may request in writing additional information or clarification from the applicant.
- (E) The Executive Officer shall not approve an application if the Executive Officer determines, based upon the information submitted in the application and any other available information, that the application does not meet requirements in subsections 95486.3(b)(1) and (b)(2). If the Executive Officer does not approve the application, the applicant will be notified in writing and the basis for the disapproval shall be identified.
- (F) If the Executive Officer determines the application has met all requirements for approval pursuant to subsections 95486.3(b)(1) and (b)(2), the Executive Officer will approve the application and provide an approval summary on the LCFS website including the site location and assigned identifier, number and type of FSE, nameplate power rating for each FSE, and effective date range for FCI pathway crediting.
- (G) Crediting Period. FCI crediting for LMD-FCI FSEs is limited to 10 years starting with the quarter the Executive Officer approves the LMD-FCI application.
(4) Requirements to Generate FCI Credits. To generate credits using the FCI pathway, a LMD-FCI FSE must meet the following conditions. The applicant must maintain, and submit to CARB upon request, records demonstrating adherence to these conditions.
- (A) The applicant must update the nameplate and FCI power ratings of any FSEs if different from the power ratings provided in the LMD-FCI application. Any FSE design or operational information that deviates from the original LMD-FCI application must be declared to the Executive Officer, and a new attestation must be submitted using the language in section 95486.3(b)(2)(K).
- (B) For a LMD-FCI FSE available to the public, no obstructions or obstacles exist to preclude vehicle operators from entering the FSE premises, no access cards or personal identification (PIN) codes are required for the FSE to dispense fuel, and no formal or registered equipment training shall be required for individuals to use the FSE.
- (C) For a LMD-FCI FSE available to the public that charges a fee for service, the site must use a public point-of-sale terminal that accepts all major credit and debit cards.
- (D) The FSE passed final inspection by the appropriate authority having jurisdiction and has a permit to operate.
- (E) The FSE owner has fully commissioned the FSE, and has declared it fit to service light- and medium-duty EV drivers.
- (F) The FSE registration must be completed pursuant to section 95483.2(b)(8) and the quantity of dispensed electricity must be reported as required in section 95491. The FSE must dispense electricity in a given quarter to generate FCI credits.
- (G) If the applicant fails to demonstrate the operability within 24 months of approval and if the estimated potential FCI credits from all approved FCI and LMD-FCI FSEs exceed 2.5 percent of deficits in the most recent quarter for which deficit data is available, then FCI certification for the LMD-FCI FSEs will be canceled. The applicant may submit a new application for the same FSEs the following quarter.
(H) The estimated cumulative value of FCI credits generated for the LMD-FCI FSEs at a site in the prior quarter must be less than the difference between 1.5 times the initial capital expenditure of the charging site, including battery storage but not on-site generation, reported pursuant to section 95486.3(b)(6)(B)1. and the sum of total grant revenue or other external funding before the station is both approved and operational, pursuant to subsections 95486.3(b)(6)(B)5. and 6.
- 1. The estimated value of FCI credits, for the purpose of this determination, shall be calculated using the number of FCI credits generated for the LD-FCI FSE in the quarter and the average LCFS credit price for that quarter published on the LCFS website.
- 2. The estimated value calculated under this provision will be made available only to the respective reporting entity in LRT-CBTS and will not be published on the LCFS website.
- 3. This will not affect the reporting entity's ability to generate non-FCI LCFS credits for the electricity dispensed at the FSE.
(5) Calculation of FCI Credits. FCI credits for LMD-FCI FSEs will be calculated using the following equation for each FSE approved under this provision:
)
where:
)
is the average carbon intensity requirement for gasoline for a given year as provided in section 95484(d);
EERgasoline is the dimensionless Energy Economy Ratio for Electricity/BEV or PHEV relative to gasoline as listed in Table 5;
CIFCI is the California average grid electricity carbon intensity as listed in Table 7-1;
CElec is the conversion factor for electricity as listed in Table 4;
)
is the FCI charging capacity (kWh/day) for the LMD-FCI FSE;
N is the number of days during the quarter;
UT is the uptime multiplier which is the fraction of time that the LMD-FCI FSE is available for charging during the quarter;
Elecdisp is the quantity of electricity dispensed during the quarter (kWh);
C is a factor used to convert credits to units of metric tons from gCO2e and has the value of:
)
(6) Reporting and Recordkeeping Requirements. The following must be reported to the Executive Officer each quarter as set forth in section 95491 before credits will be issued to the LRT account associated with an approved FCI pathway.
- (A) FSE availability. This is the percentage of hours the FSE is available for charging during the quarter relative to the permitted hours of operation for the site.
(B) Cost and revenue data. Provide an annual account of the following costs borne and revenues received for the site. The cost and revenue account must be included in the annual report submitted pursuant to section 95491.
- 1. Total capital expenditures ($), including a breakdown of initial capital expenditure by equipment, labor, materials, land, and fees ($). Costs for land, working capital and off-site facilities are not included in the initial capital expenditure;
- 2. Total delivered cost ($) of electricity, including demand charges, and average delivered cost ($/kWh) for electricity;
- 3. Total maintenance costs ($);
- 4. Total land rental cost ($);
- 5. Total grant revenue or other external funding received towards capital expenditures ($);
- 6. Total grant revenue or other external funding received towards operational and maintenance expenditures ($);
- 7. Total revenue ($) received from sale of electricity and average retail price ($/kWh) for electricity sold;
- 8. Other operational expenditures ($).
Note: Authority cited: Sections 38510, 38530, 38560, 38560.5, 38562.2, 38571, 38580, 39600, 39601, 41510, 41511 and 43018, Health and Safety Code. Reference: Sections 38501, 38510, 39515, 39516, 38571, 38580, 39000, 39001, 39002, 39003, 39515, 39516, 41510, 41511 and 43000, Health and Safety Code; Section 25000.5, Public Resources Code; 42 U.S.C. Section 7545; and Western Oil and Gas Ass'n v. Orange County Air Pollution Control District, 14 Cal.3d 411, 121 Cal.Rptr. 249 (1975).
History
1. New section filed 6-27-2025; operative 7-1-2025 (Register 2025, No. 26).