The department shall use the following criteria as the minimum basis for determining when to use the design-build method of project delivery:
- 1. The extent to which it can adequately define the project requirements.
- 2. The time constraints for delivery of the project.
- 3. The capability and experience of potential teams with the design-build method of project delivery.
- 4. The suitability of the project for use of the design-build method of project delivery in the areas of time, schedule, costs and quality.
- 5. The capability of the department to manage the project, including the employment of experienced personnel or outside consultants.
- 6. The capability of the department to oversee the project with persons who are familiar with the design-build method of project delivery.
- 7. Other criteria the department deems relevant.