- A. A marijuana establishment shall ensure that the licensed premises are maintained free from hazards.
- B. A marijuana establishment shall provide on-site parking or parking adjacent to the building used as the marijuana establishment’s retail site.
C. A building used as a marijuana establishment’s retail site or the location used as a marijuana establishment’s cultivation site or manufacturing site shall have:
- 1. At least one toilet room;
2. Each toilet room shall contain:
- a. A flushable toilet;
- b. Mounted toilet tissue;
- c. A sink with running water;
- d. Soap contained in a dispenser; and
- e. Disposable, single-use paper towels in a mounted dispenser or a mechanical air hand dryer;
- 3. At least one hand washing sink not located in a toilet room, with running water, soap contained in a dispenser, and either disposable, single-use paper towels in a mounted dispenser or a mechanical air hand dryer;
- 4. Designated storage areas for marijuana or materials used in direct contact with marijuana, separate from storage areas for toxic or flammable materials; and
5. If preparation or packaging of marijuana is done in the building, a designated area for the preparation or packaging that:
- a. Includes work space that can be sanitized, and
- b. Is only used for the preparation or packaging of marijuana.
D. For each commercial device used at a marijuana establishment retail site, cultivation site, or manufacturing site, the marijuana establishment shall:
- 1. Ensure that the commercial device is licensed or certified pursuant to A.R.S. § 3-3451,
- 2. Maintain documentation of the commercial device’s license or certification, and
- 3. Provide a copy of the commercial device’s license or certification to the Department for review upon request.
Historical Note
New Section made by exempt rulemaking at 27 A.A.R. 140, effective January 15, 2021 (Supp. 20-4). R9-18-316 renumbered to R9-18-317; new Section R9-18-316 renumbered from R9-18-315 and amended by exempt rulemaking at 29 A.A.R. 2453 (October 13, 2023), effective October 1, 2023 (Supp. 23-3).