- 1. A site plan showing the location of the manufactured home, mobile home, or FBB;
- 2. A copy of the designated flood-use permit or flood design conditions issued by the local enforcement agency showing the flood zone type and regulatory and base flood elevations;
3. A site-specific foundation plan that is prepared by an Arizona registered engineer and includes:
- a. A complete set of drawings indicating dimensions and details of the foundation system and anchoring to prevent floatation, collapse, or lateral movement of the structure;
- b. A complete list of materials cross identified to the drawings in subsection (3)(a) showing how the materials will be used;
- c. An indication of how to place to the structure to ensure the bottom frame of the structure is at or above the regulatory flood elevation;
- d. An indication of where to place external utilities and equipment to ensure they are at or above the regulatory flood elevation;
- e. If the structure has an enclosed foundation, an indication of where to place flood vents or other openings; and
- f. All calculations used to determine all load conditions; and
- 4. Written approval of the information in subsections (1) through (3) from the local flood-district administrator having authority.
Before installing a manufactured home, mobile home, or FBB in a designated flood-prone area, an installer shall submit and obtain Department approval of an installation plan that includes the following:
Historical Note
New Section made by final rulemaking at 24 A.A.R. 1499, effective June 30, 2018 (Supp. 18-2).