Ariz. Admin. Code § R18-14-108
| Permit Description | Permit Fee | Renewal Fee |
| Standard Type 2: 2.01, 2.03, 2.04, 2.05, and 2.06 | $2,141 | $714 |
| Complex Type 2: 2.02 | $4,281 | $1,427 |
| Standard Type 3: 3.02, 3.03, 3.05, 3.06, and 3.07 | $6,422 | $2,141 |
| Complex Type 3: 3.01 and 3.04 | $10,703 | $3,568 |
| Amendment to Notice of Intent | Same as applicable renewal fee | N/A |
| Transfer of permit authorization | $71 | N/A |
| If a site contains more than one facility covered by the same Type 2 or Type 3 General Permit and each facility is substantially similar in design, construction, and operation, the first facility is paid at the full applicable fee, and each additional facility is: | Half the applicable fee | Half the applicable fee |
| Water Quality Protection Service | Description | Permit Fee |
| 4.01 General Permit: Sewage Collection Systems | Under each Notice of Intent to Discharge, the fee is assessed on a per-component basis for the components listed below and is assessed cumulatively up to the maximum fee: | |
| § Maximum fee | $35,675 | |
| § Force mains with design flow less than or equal to 10,000 gpd | $1,427 | |
| § Each additional increment of 50,000 gpd or less of force mains | $1,427 | |
| § Gravity sewer with design flow less than or equal to 10,000 gpd | $1,427 | |
| § Each additional increment of 50,000 gpd or less of gravity sewer | $1,427 | |
| § Each sewer lift station | $1,427 | |
| § Each depressed sewer | $1,427 | |
| § Realignment of existing sewer for a contiguous project that is less than 300 linear feet with no change in design flow or pipe size | $714 | |
| 4.01 General Permit courtesy review | If an applicant requests courtesy review, the Department shall approve or deny the request. When determining whether to approve a courtesy review request, the Department shall consider the complexity of the project and the Department’s current work load | One-third applicable fee upon submittal, then balance of fee if Notice of Intent to Discharge is submitted with final documentation within 180 days of first submittal |
| 4.23 General Permit: 3,000 to less than 24,000 Gallons per day Design Flow | § Onsite wastewater treatment facility with up to: • Three treatment technologies and disposal methods consisting of technologies or designs that are covered under other Type 4 general permits; and • Two onsite wastewater treatment facilities | $5,137 |
| § Maximum fee (cumulative) | $10,703 | |
| § Each additional onsite wastewater treatment facility on same Notice of Intent to Discharge up to maximum fee | $1,712 | |
| § Each additional treatment technology or disposal method consisting of technologies or designs that are covered under other Type 4 general permits on same Notice of Intent to Discharge up to maximum fee | $714 | |
| 4.23 General Permit annual report | Annual report required under A.A.C. R18-9-E323(G) | $285 |
| Type 4 General Permits (4.02 through 4.22) | § Maximum fee | $5,280 |
| § First Type 4 general permit | $1,712 | |
| § Each additional Type 4 general permit on same Notice of Intent to Discharge | $714 | |
| Alternative Design under A.A.C. R18-9-A312(G) | A request for an alternative design, installation, or operational feature, per alternative design: | |
| § Type 4.01 general permit | $1,070 | |
| § All other Type 4 general permits | $357 | |
| Interceptor under A.A.C. R18-9-A315 | A design requiring an interceptor (per interceptor) | $143 |
| Transfer | Transfer of discharge authorization | $71 |
| Priority Review | If an applicant requests priority review, the Department shall approve or deny the request. When determining whether to approve a priority review request, the Department shall consider the complexity of the project and the Department’s current work load. | Double the Applicable Fee (including any applicable maximum fee) |
Adopted effective November 15, 1996 (Supp. 96-4). Section repealed by final rulemaking at 7 A.A.R. 564, effective January 2, 2001 (Supp. 01-1). New Section made by exempt rulemaking at 16 A.A.R. 851, effective July 1, 2010 (Supp. 10-2). Amended by exempt rulemaking at 16 A.A.R. 1505, effective July 1, 2010 (Supp. 10-3). Amended by final rulemaking at 17 A.A.R. 568, effective July 1, 2011 (Supp. 11-2). Tables 4 and 5 removed from this Section to conform with the A.A.C. codification scheme; amended by final rulemaking at 29 A.A.R. 1869 (August 25, 2023), with an immediate effective date of August 4, 2023 (Supp. 23-3).