(1) Every landfill operated within the Boston Mountain Regional Solid Waste Management District shall be designed and constructed with a double composite liner system which consists of, at a minimum, the following: upper and lower composite liners separated by a leachate detection and collection system.
(2) Each composite liner shall consist of a flexible membrane liner underlain by a compacted clay liner.
(b)
(1) Every landfill constructed after the effective date of this subpart must employ a third-party engineering firm to ensure proper construction of each component of the containment structure and operation of the landfill.
(2) The permittee will pay all costs of this control.