(a) Application procedures.
- (1) Applications for an individual permit for construction and demolition recovery facilities shall conform to the requirements of Administrative Procedures, 8 CAR pt. 11, and this section.
- (2) Applicants applying for coverage under a general permit shall comply with the procedures established in the general permit program.
(b) Application contents. An application for a permit for solid waste recovery facilities shall be made on forms provided by the Division of Environmental Quality and shall include, either on the form or supporting documentation, the following:
- (1) Owner of the site and proposed entity responsible for actual operation and maintenance of the facility;
- (2) A map or aerial photograph indicating land use and zoning within one-half (1/2) mile of the facility which shall be of scale not smaller than one inch equals five hundred feet (1” = 500’) to show all residences, structures, surface waters, public and private water supply sources, access roads, railroads, airports, historic sites, and other existing features of the project;
- (3) Maps indicating the existence of any regulated wetlands or floodplains on or near the site;
(4) A site plan map that delineates:
- (A) The proposed or existing buildings and improvements including any staging and storage areas for incoming solid waste and recovered materials;
- (B) Survey boundary locations, the location of existing and proposed access roads, utilities, and any other site improvements; and
- (C) General site topography, existing and proposed drainage characteristics including any run-on and run-off control systems that will be constructed;
- (5) A description of the annual Class 4 types of solid waste throughput and the service area population (both present and projected), and the estimated amount of material recovered by type;
- (6) Permit plans and specifications clearly indicating the layout and construction that will be undertaken and an engineering narrative describing the facility design;
(7) An operating plan meeting the requirements of this subpart outlining:
- (A) The proposed method of operations;
- (B) The quantity and source of material to be processed;
- (C) The proposed use and distribution of the processed or recovered material;
- (D) A plan for the disposal of materials that cannot be used or recovered due to poor quality or changes in market conditions; and
- (E) Related details; and
- (8) Additional data or information as may be required by the division.