(b) If the maximum design capacity of a landfill increases such that the maximum design capacity is equal to or exceeding two and one-half million (2,500,000) megagrams by mass or two and one-half million (2,500,000) cubic meters by volume:
- (1) The owner or operator shall submit to the division an amended design capacity report within ninety (90) days of the increase in maximum design capacity; and
- (2) The owner or operator shall obtain a Part 70 permit in accordance with the procedures of Rules of the Arkansas Operating Air Permit Program, 8 CAR pt. 42, and comply with 8 CAR §§ 41-1607 and 41-1608.