- (a) The permittee shall furnish and install all materials, including fill material and drainage structure, if required.
- (b) All materials used must comply with the requirements contained in this part and/or specified by the engineer.
- (c) The permittee shall perform all work in connection with the construction of access driveways and their appurtenances on the right-of-way and all work required to remove the driveway and restore the right-of-way to its original condition.
- (d) However, the Arkansas Department of Transportation may assist by establishing flow line grades for drainage structures and finish grades for driveway surfaces or such other comparable assistance, which the engineer may agree to perform.