(a) The permittee shall furnish and install all materials, including:
- (1) Fill material;
- (2) Surfacing; and
- (3) Drainage structures.
- (b) All materials used must comply with the requirements contained in this part and/or specified by the engineer.
- (c) The permittee shall perform all work in connection with the construction of access driveways and their appurtenances on the right-of-way.
- (d) However, the Arkansas Department of Transportation may assist by establishing flow line grades for drainage structures and finish grades for driveway surfaces or such other comparable assistance, which the engineer may agree to perform.