(a)
- (1) When the use of a consultant has been approved, the utility owner will be authorized to have the consultant proceed with preparing a preliminary engineering fee estimate and contract.
- (2) The engineer's fee shall not be based on a percentage of the cost of relocation.
- (b) The preliminary fee estimate, contract documents, and the consulting engineer's certification, in the form designated by the Arkansas Department of Transportation, shall be submitted for Utilities Section approval.
(c)
- (1) The Utilities Section will then prepare a preliminary engineering agreement (PE agreement) to be executed by the department and the utility owner.
- (2) The consultant will be required to begin and complete the preliminary engineering contractual obligations within a specified number of days.
(d) Following proper execution of the PE agreement, the Utilities Section will issue a preliminary engineering work order to the utility owner authorizing the consultant to begin the preliminary engineering of the work encompassing the following:
- (1) Field surveys and investigations, including any and all work to secure the proper information to prepare plans, specifications, cost estimates, and necessary easements;
- (2) Preparation of complete and detailed plans of the existing and proposed facilities with an itemized cost estimate for the relocation work;
(3)
- (A) Preparation of contract documents and specifications incident to the advertisement of bids.
- (B) One (1) copy of the specifications is required in the initial submittal; and
- (4) Submission of all necessary documents through the utility owner to the Utilities Section and to other agencies having jurisdiction when required.
- (e) After approval of the cost estimate and plans, a relocation agreement will be prepared and submitted to the utility owner for execution.
- (f) After receiving the fully executed relocation agreement, the Utilities Section will authorize the utility owner to proceed with advertising for bids and/or acquisition of necessary right-of-way.
- (g) After the bids have been opened, the utility owner will submit one (1) copy of each bid received and the bid tabulation sheet to the Utilities Section with a request for the department concurrence in award of the contract to the lowest qualified bidder.
(h)
- (1) After concurrence, the utility owner shall submit two (2) copies of the executed contract and two (2) sets of the completed specifications to the Utilities Section.
- (2) After these documents have been approved, the Utilities Section will issue a contract work order to the utility owner.
Codification Notes: “PE” means preliminary engineering.