(a) System maps.
- (1) Each electric utility shall maintain current system schematic drawings and maps depicting plant in all service areas served by the electric utility.
- (2) Those maps or plans shall be in sufficient detail to enable prompt location of each line and facility owned or operated by the electric utility.
- (3) Each system map and its associated records shall be maintained in sufficient detail to enable the reconstruction of the system, if required.
(b) Changes to maps.
- (1) Each electric utility shall map or add each change, relocation, or extension of plant to existing system maps no later than twenty-four (24) calendar months after the change, relocation, or extension is completed.
- (2) Until such changes are posted to the system maps, either sufficiently detailed engineering drawings showing the changes or a reference to the location of the drawings shall be attached to the existing maps.
Codification Notes: This section was promulgated as Rule 2.07 of the Special Rules — Electric prior to codification in the Code of Arkansas Rules.