- (a) During the progress of the work, the contractor shall keep an accurate record of all changes and corrections from the layouts shown on the drawings.
- (b) All changes must be accurately marked on a set of prints during the progress of the job.
- (c) Exact locations of all underground utility service entrances and their connections to utility mains, as well as all valves, etc., which will be concealed in the finish work shall be accurately indicated on the drawings by measured distances.
- (d) Depths and horizontal distances shall be indicated.
- (e) Upon completion of the work and prior to final payments, the contractor shall furnish to the design professional one (1) set of record reproducible prints legibly and accurately drawn to indicate all changes, additions, deletions, etc., from the contract drawings.
- (f) The design professional shall verify and add any additional information required before transmitting these reproducible prints to the department.
- (g) On Building Authority Division owned property, the Design Review Section shall receive the copy of the record drawings of reproducible prints or CD/DVD copies for record keeping.
Codification Notes: "CD/DVD" means compact disc/digital video disc.