- (a) All examinations, inspections, and testing shall be performed in accordance with ASME B31.1, as adopted, with regard to frequency and manner.
- (b) The owner shall be responsible for all examinations and inspections whether or not the owner performs the examinations and inspections himself or herself.
- (c) The examinations and inspections shall be performed by an authorized inspector.
- (d) Verification must be reported to the Boiler Inspection Division after the work is completed and prior to the installation becoming operational.