(a)
- (1) For planned renovation operations involving individual, nonscheduled operations of a combined additive amount of RACM to be removed or stripped during a calendar year in the amounts of at least eighty linear meters (80 m) (two hundred sixty linear feet [260’]) of pipe, at least fifteen square meters (15 m2) (one hundred sixty square feet [160 ft2]) on other facility components, or at least one cubic meter (1 m3) (thirty-five cubic feet [35 ft3]) of facility components where the length or area could not be measured previously, the owner or operator shall submit a written NOI to the Division of Environmental Quality by either hand delivery, postmarked by the United States Postal Service, or postmarked by a commercial delivery service by December 21 for the upcoming calendar period of January 1 through December 31.
- (2) This notice must be accompanied by the required fee which is described in Subpart 16 of this part.
- (b) To determine whether this section applies to planned operations involving nonscheduled operations, the owner or operator shall predict the combined additive amount of RACM to be removed or stripped during a calendar year of January 1 through December 31.
Codification Notes: “NOI” means notice of intent. "RACM" means regulated asbestos-containing material.