2 CAR § 54-501
(b) Pretreatments shall be made as directed by one (1), or a combination, of the following treatment methods:
(1)
(c) (c) In addition to the establishment of both vertical and horizontal chemical barriers in the soil, the building must meet the minimum requirements given for existing structures in 2 CAR §§ 54-401 – 54-410 and § 54-411(a).
(b) (b) Chemical must be applied at concentration rate and volume according to the label directions in the soil adjacent to the foundation wall around the outside of the building to establish a vertical barrier in the soil.
(c) (c) In addition to the establishment of horizontal and vertical chemical barriers in the soil, the building must meet the minimum requirements given for existing structures in 2 CAR § 54-403(b), § 54-405, § 54-407, § 54-408, § 54-410, and § 54-411(a).
(b) (b) Note. Contracts and graphs must specify when foam treatment is used and clearly state the name and the Environmental Protection Agency registration number of the product used.
(2)
(C) In addition, crawl space buildings must meet items of the minimum requirements for existing structures in 2 CAR § 54-401, 2 CAR §§ 54-403 – 54-406, and 2 CAR § 54-411(a).
(2) Note.