(a)
- (1) A narrative description of the proposed project is required.
- (2) The format, style of presentation, and length may vary depending on the nature of the project.
(b) The narrative shall include the following sections:
(1)
- (A) Ownership.
- (B) Legal ownership along with the names, titles, contact information, and roles of principal participants in feedstock processing facility;
(2)
- (A) Location.
- (B) Physical address of facility;
(3)
- (A) Description of current operation.
- (B) If in operation, describe facility including:
(i) Feedstock processed;
(ii) Current market;
(iii) Production levels; and
- (iv) Cost per unit; and
(4)
- (A) Intended use of grant.
- (B) Describe construction, modification, alteration, or retrofitting of feedstock processing facility.
- (C) Include pro forma operating statement, cash flow analysis, projected per unit cost, permitting requirements, and anticipated markets for feedstock.