(a) Construction water.
- (1) Water used in the drilling process should be obtained from a source that will not result in contamination of the well.
- (2) It is required that an appropriate amount of chlorine solution be added to the construction water in order to protect the well from contamination.
- (3) Please refer to the tables in 17 CAR § 11-1001 et seq., to determine the proper amount of chlorine to use.
(b) Plumbness and alignment.
- (1) Each drilled well shall be tested for plumbness and alignment, and the bore of the hole shall be sufficiently plumb and straight to receive the casing without binding.
- (2) The casing shall be sufficiently plumb and straight so that it will not interfere with installation and operation of the pump.
(c) Yield. Each well shall be tested for yield and draw down by:
- (1) Pump;
- (2) Bailer; or
- (3) Air.