- (a) The applicant shall submit two (2) copies of the engineering report, including environmental information, for review.
(b)
- (1) The Arkansas Natural Resources Commission staff will approve the engineering report after confirming that the appropriate requirements have been met.
- (2) Part of the confirmation is showing that an environmental determination has been made according to 15 CAR § 26-305 (relating to the environmental review).
- (3) The applicant has to agree to incorporate all mitigating measures as directed by the commission staff.
(c) The project engineering report shall contain at a minimum the information described below:
(1) Identification of the:
- (A) Planning area boundaries and characteristics;
- (B) Existing problems and needs related to wastewater management; and
- (C) Projected needs and problems for the next twenty (20) years;
(2)
- (A) Demonstration that each existing sewer collection system is not or will not be subject to excessive infiltration/inflow, including a sewer system evaluation survey if required.
- (B) Memorandum of agreement time extensions can be obtained if extra time is needed for the sewer system evaluation survey;
- (3) Systematic identification, screening, study, evaluation, and cost-effectiveness analysis of best practical wastewater treatment technologies;
- (4) Adequate evaluation of the environmental impacts of alternatives according to 15 CAR § 26-305, relating to environmental review and determination, to support the cost-effectiveness analysis;
- (5) Description of the proposed project in terms of quantities in each category of need, capital costs, and operation and maintenance costs;
(6) If collection lines are included, establishment of whether they are for:
- (A) Correction of I/I problems of the wastewater facilities servicing the community; or
- (B) A new collection system in an existing community with sufficient existing or planned wastewater treatment capacity;
- (7) Documentation on the project's consistency with the approved elements of any applicable water quality management plan approved under Section 208 or Section 303(e) of the Act;
(8)
- (A) A capital financing plan for the proposed project including:
(i) A projection of future needs for construction and reconstruction; and
(ii) An explanation of how and when the financing will be obtained.
- (B) Other funding sources will be identified if applicable;
(9) An analysis of the impact the proposed project will have on user charges for:
- (A) Operation;
- (B) Maintenance;
- (C) Replacement; and
- (D) Debt service costs;
(10) A schedule for implementation of the project including dates for the:
- (A) Certification of the application for assistance;
- (B) Start and completion of construction; and
- (C) Certification of project performance;
- (11) Information on the environment of the planning area and the direct and indirect environmental impacts the proposed project will have;
- (12) Evidence of adequate public participation in the development of the engineering report and environmental information concerning the proposed project including the solicitation of comments from appropriate state and federal agencies; and
- (13) Other information deemed necessary by the commission staff based on the scope, complexity, or special aspects of the proposed project.
Codification Notes: "I/I" means inflow/infiltration.